My WebLink
|
Help
|
About
|
Sign Out
ORD 1547
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1501 - 1600
>
ORD 1547
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2004 11:44:55 AM
Creation date
3/10/1999 7:45:48 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1547
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
46. That if a sanitary sewer lift station is installed for use by <br /> the development and if i= is accepted by the City for <br /> maintenance and operation, an agreement shall be completed <br /> between the City and the developer prior to the approval of <br /> the development to the effect that the developer will provide <br /> <br /> 47. That approval of the storm drainage system be withheld pending <br /> final design and until the developer has demons=rated to the <br /> satisfaction of the City Engineer that the system is adequate, <br /> connects =o an approved point of discharge, meets any and all <br /> applicable requirements of the Alameda County Flood Control <br /> District - Zone 7, meets any and all applicable requirements <br /> of the Federal Emergency Management Flood Hazard Program, and' <br /> meets the immediate and long-range requirements of this <br /> development and all upstream areas in=ended to be drained <br /> through this development. <br /> <br /> 48. That electric power distribution, gas distribution, <br /> communication service, and any required alarm systems be <br /> installed underground in a joint utility trench unless <br /> otherwise specifically approved by the City Engineer. <br /> <br /> 49. That the developer be responsible for the installation of the <br /> sTarset lighting system serving the development. The street <br /> lights shall be 70 watt, high pressure sodium vapor units <br /> mounted on galvanized steel poles with poured in place bases, <br /> on the LS-lC schedule per City requirements and P.G.&E. <br /> standard details unless oT~lerwise specifically approved. <br /> Approval for the number, location, and type of electrollers <br /> shall be withheld pending final design and review by the City <br /> Engineer. <br /> <br />50. That this development provide a safe and effective circulation <br /> system for bicycles and pedestrians. These facilities shall <br /> be designed and installed to the satisfaction of the City <br /> Engineer and shall be separated from vehicular traffic <br /> whenever possible. <br /> <br />51. That the developer submit detailed landscape and irrigation <br /> plans as part of the improvement plans. These plans should <br /> include, where applicable, a street tree planting plan and <br /> landscape plans for medians, buffer strips, and any right-of- <br /> way landscape areas. The irrigation plan shall provide for <br /> automatic controls. <br /> <br />52. That any damage to street improvements now existing or done <br /> during construction on the sua~ject property be repaired toE he <br /> satisfaction of the City Engineer at full expense to the <br /> developer. This shall include slurryseal, overlay, or street <br /> reconstruction if deemed warranted by the City Engineer. <br /> <br />Rev. 2/84 10/84 5/86 10/86 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.