Laserfiche WebLink
f. rnn~pmg and walla should be mstakl~ such that the lot drainage system <br /> designed by the civil enginee~ is not disrupted. WaW. z should not be allowed <br /> to pond on the lot. <br /> <br /> g. Conditions, covenants and restrictions (CC&.Rs) for the subdivision should <br /> include the lot drainage requirements. Specific reference to drainage <br /> requirements should be included in the deed for each lot in order to px'~vent <br /> homeowners from altering drainage on the loL <br /> <br />75. The recommendations and plans provided by tlz lot owner' s geotechnical and civil <br /> engineers should be carried out complew. ly and co~ctly by the owner's contractor. <br /> The g~ and civil en~,,,'--s should 'pwvid~ conlinuous inspection during <br /> con,Vlz1/clion in orciex to ellauze that thei.r l'ex~m~rlntinnS and pla/Is ~ being <br /> protRuly implemented. (MM 9.E.3) <br /> <br />76. Prior to tentative map approval, the potential for seismically induced lan&ttides and <br /> liqueiction must be investigted in detail. De~ib-,t investigations are required for <br /> evaluation and preparation of slope/mhilir~rinn plalB. Thil inve~tigalion toILet <br /> include an evaluation of the potential for activation of l~ri,llrh,~ duzing an <br /> earthquake. If a high potmtial for activation exists then the slope stabni-=tlon plans <br /> must include measures for reducing the !i~ihood of earthqualm caused landslides. In <br /> addition, the liqudaction potential of the soil must be evaluated. If a high <br /> liqBefa{iioll potelltial existl the~ _I?eo__mm~ei~tlonl for rVinimin~ng ftlttlr~ ttnm:~ must <br /> be inc~porated into the subdivision d~gm (MM 9.1:. l) <br /> <br /> All buildings should be designed and con.m'uct~ in a~:ordan~ with th~ Cit7 of <br /> P1easanUm building codes, pan~,l~rty tho~ seclions of the cod~ r~garding <br /> earthqg r~stant design. Th8 geol~..hnica[ investigation vzpon for each lot should <br /> inClUde ~ de,~II l'eCOlDlll~lil~ ~ _reeO__mm~_ti-'afinns for sit~ period <br /> or soil pw~le coefficient as well as a disamion of seismically inducBi landslides. <br /> (MM 9.F.2) <br /> <br />78. The snr¢-,~: drainage system for the daelopmmt as a whole should be evaluated by <br /> fig geot~__hrd,-,,i engineer and ~g geologist in order to aletin'mine the effects <br /> of the suzface drainage sysW. m on spsings and the groundwater regime at the site. <br /> Clam 9,O, 1) <br /> <br /> Th~ recommendations of the gw~_.,,i,-~i ~gine~r and ~g g~t ~ <br /> ~~bym~s~d~~~~. ~m~ <br /> ~ ~ ~o~ be ~ by ~ ~g ~ .d~g ~di~g ~ O~ ~ <br /> <br /> ~ 1~ of ~ sub~ m' ~d ~ ~ on ~t ~ngs. ~ <br /> 9.0.2) <br /> <br /> <br />