My WebLink
|
Help
|
About
|
Sign Out
ORD 1554
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1501 - 1600
>
ORD 1554
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2004 11:46:59 AM
Creation date
3/10/1999 7:35:28 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1554
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
29. That the property owner enter into an agreement with the City <br /> whereby he agrees to construct or finance the construction of <br /> street improvements adjacent to =he site to the extent <br /> required by the Subdivision Ordinance a= such time in the <br /> future as this is deemed necessary by the City Engineer. Said <br /> improvements may include, but are not necessarily limited to <br /> grading, curb and gutter, sidewalk, paving, street lighting, <br /> street trees, street monuments, underground utilities, storm <br /> drain facilities, sanitary sewer facilities, tree removal, <br /> traffic control devices, landscaping and automatic irrigation <br /> systems. This agreement shall be executed and approved by the <br /> City Council prior to the issuance of a building permit. The <br /> property owner/developer shall deposit a bond with the City to <br /> ensure future completion of the required improvements. This <br /> bond shall be in a standard form approved by the City Attorney <br /> and shall be in an amount satisfactory to the City Engineer. <br /> The City Engineer may accept or may require a cash payment <br /> in-lieu of bonding where circumstances warrant. <br /> <br /> 30. That the developer submit a refundable cash bond for hazard <br /> and erosion control prior to issuance of a building permit. <br /> The amount of this bond will be determined by the City <br /> Engineer. <br /> <br />31. That a sanitary sewer sampling manhole be provided on the <br /> sanitary sewer lateral from. each building, unless otherwise <br /> waived by the City Engineer. <br /> <br />32. That prior to issuance of a building permit, the developer <br /> shall pay the applicable Zone 7 and City connection fees and <br /> water meter cost for any water meters (irrigation meters) not <br /> directly related to a building permit. <br /> <br />33. That the developer dedicate to the City for a street right-of- <br /> way purposes those parcels of land intended to be public <br /> streets. <br /> <br />34. That the developer grant. an easement to the City over those <br /> parcels shown as public service easements (P.S.E.) and which <br /> are approved by the City Engineer or other parcels which may <br /> be designated by the City Engineer. <br /> <br />35. That approval of the design for the 1 ins, grade, and <br /> structural sections for the streets serving this development <br /> be withheld pending final engineering design and review by the <br /> City Engineer. <br /> <br />36. That vertical P.C.C. curbs and gutters be constructed within <br /> this development unless otherwise approved by the City <br /> Engineer and that the curb andgutter be poured monolithically <br /> with the sidewalk when the sidewalk is adjacent. <br /> <br />Rev. 2/S4 10/84 5/S6 10/S6 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.