Laserfiche WebLink
Finding: Mitigation Measures 8-11 and 8-12 Feasible and Required <br /> <br /> The City finds that it is feasible to mitigate this impact to a <br /> less-than-significant level by requiring the applicant and <br /> successors in interest to incorporate the specific provisions of <br /> Mitigation Measures 8-11 and 8-12 into the project design. The <br /> applicant and successors in interest shall incorporate such <br /> differential fill settlement impact reduction provisions into <br /> project design as a "Condition of Approval" to the project. <br /> <br />Expansive Soil <br /> <br /> Impact: Potential structural damage from expansive soil <br /> <br /> The City finds that the project may experience damage to structures <br /> by earth movement from changing soil moisture content (Draft EIR, <br /> page 8-15). <br /> <br /> Proposed Mitigation Measures.of the EIR <br /> <br /> The EIR identified the following mitigation measures which would <br /> substantially avoid this impact. <br /> <br /> 8-13 Evaluate for expansive soil and design structures to resist <br /> soil movement (Draft EIR, page 8-15). Said mitigation measure <br /> was considered and adopted with any pertinent changes in <br /> Condition 8-13, Exhibit "B" of the City Council staff report <br /> dated June 16, 1992. <br /> <br /> 8-14 Design surface drainage system to control surface drainage to <br /> reduce seasonal fluctuations in soil moisture content (Draft <br /> EIR, page 8-15). Said mitigation measure was considered and <br /> adopted with any pertinent changes in Condition 8-14, Exhibit <br /> "B" of the City Council staff report dated June 16, 1992. <br /> <br /> 8-15 Follow appropriate construction procedures ~o avoid expansive <br /> soil damage (Draft EIR, page 8-16). Said mitigation measure <br /> was considered and adopted with any pertinent changes in <br /> Condition 8-15, Exhibit "B" of the City Council staff report <br /> dated June 16, 1992. <br /> <br /> Finding: Mitigation Measures 8-13 through 8-15 Feasible and <br /> Required <br /> <br /> The City finds that it is feasible to mitigate this impact to a <br /> less-than-significant level by requiring the applicant and <br /> successors in interest to incorporate the specific provisions of <br /> Mitigations 8-13 through 8-15 into the project design. The <br /> applicant and successors in interest shall incorporate such <br /> expansive soil impact reduction provisions into project design as <br /> a "Condition of Approval" to the project. <br /> <br /> 19 <br /> <br /> <br />