Laserfiche WebLink
72. The design of the water supply and sanitary sewer systems shall be subject to the review <br /> and approval of the City Engineer. <br /> <br />73- Approval of the storm drainage system shall be subject to the review and approval of the <br /> City Engineer and Zone 7, as applicable, that the system is adequate, connects to an <br /> approved point of discharge, meets any and all applicable requirements of the Alameda <br /> County, Flood Control District - Zone 7, meets any and all applicable requirements of the <br /> Federal Emergency Management Flood Hazard Program, the California Department of <br /> Fish and Game, and meets the immediate and long-range requirements of this <br /> development and all upstream areas intended to be drained through this development. <br /> <br />74. Electric power distribution, gas distribution, communication service, cable television, and <br /> any required alarm systems shall be installed underground in a joint utility trench unless <br /> otherwise specifically approved by the City Engineer or Director of Building Inspection <br /> for on-site <br /> <br /> 75. The applicant shall be responsible for the installation of the street lighting system serving <br /> the development. The street lights shall be of an ornamental carriage-type of design. <br /> Approval for the number, location, and type of electroliers shall be subject to the review <br /> and'approval of the City Engineer and Planning Director. <br /> <br /> 76. Street lighting for the development shall be designed and located so as to minimize <br /> off-site glare to the greatest extent possible, subject to the review and approval of the City <br /> Engineer and Planning Director. <br /> <br /> 77. The applicant shall submit detailed landscape and irrigation plans as part of the <br /> improvement plans. These plans should include, where applicable, a street tree planting <br /> plan and landscape plans for medians, buffer strips, and any right-of-way landscape areas. <br /> The irrigation plan shall provide for automatic controls. <br /> <br /> 78. Any damage to existing street improvements during construction on the subject property <br /> shall be repaired to the satisfaction of the City Engineer at full expense to the developer. <br /> This shall include slurry seal, overlay, or street reconstruction if deemed warranted by the <br /> City Engineer. <br /> <br /> 79. The applicant's contractor(s) shall obtain an encroachment permit from the City Engineer <br /> prior to moving any construction equipment onto the site <br /> <br /> 80. The applicant shall install at least one street tree per lot, two per corner lot, subject to the <br /> approval of the City Engineer. <br /> <br /> 81. The applicant shall construct a bus pull-out area, the location and geometrics of which <br /> shall be subject to the review and approval of the City Engineer <br /> 82. The applicant shall comply with the City's non-point storm drain ordinance. <br /> <br /> PUD-96-15 CONDITIONS OF APPROVAL Page l0 of 12 <br /> <br /> <br />