Laserfiche WebLink
66. The applicant shall label all on-site storm drain inlets with the wording, "No Dumping - <br /> Drains to Bay" using City-approved methods and materials. On-site storm drain <br /> facilities shall be cleaned a minimum of twice a year as follows: immediately prior to <br /> October 15 and once in January. Additional cleaning may be required if found necessary <br /> by the City Engineer/Director of Building Inspection. <br /> <br />(pd9506rv.coa) <br /> <br /> City Council PUD-95-06 <br /> Conditions of Approval Page 13 2nd Revised Site Plan <br /> <br /> <br />