My WebLink
|
Help
|
About
|
Sign Out
ORD 1672
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1601 - 1700
>
ORD 1672
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2004 12:10:24 PM
Creation date
3/9/1999 7:50:12 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1672
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
66. The applicant shall label all on-site storm drain inlets with the wording, "No Dumping - <br /> Drains to Bay" using City-approved methods and materials. On-site storm drain <br /> facilities shall be cleaned a minimum of twice a year as follows: immediately prior to <br /> October 15 and once in January. Additional cleaning may be required if found necessary <br /> by the City Engineer/Director of Building Inspection. <br /> <br />(pd9506rv.coa) <br /> <br /> City Council PUD-95-06 <br /> Conditions of Approval Page 13 2nd Revised Site Plan <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.