Laserfiche WebLink
25. The developer shall ensure that fire protection facilities, including all surface roads, fire <br /> hydrants, and a water supply capable of furnishing the required fire flow shall be installed <br /> and serviceable prior to and during the time of construction. When alternate methods of <br /> protection are as approved by the Fire Chief, this requirement may be waived or <br /> modified. Proposed altemative methods of fire protection shall be submitted, in writing, <br /> to the Fire Chief. Work on the alternative fire protection methods shall not start without <br /> the approval of the Fire Chief. <br /> <br />26. The developer shall dedicate to the City for street right-of-way purposes those parcels of <br /> land intended to be public streets and shall grant an easement to the City over those <br /> parcels needed for public service easements (P.S.E.) and which are approved by the City <br /> Engineer or other easements which may be designated by the City Engineer. <br /> <br />27. The developer shall install stop signs on the north and south ends of Calle Ricardo at its <br /> intersection with Hansen Drive and Black Avenue. A four-way stop sign shall be <br /> installed at the intersection of Calle Ricardo and Black Avenue. A "Not A Through <br /> Street" sign shall be placed at the entrance to the project cul-de-sac. The radius of the <br /> right-of-way of the project cul-de-sac (Corte Margarita) shall be increased from 45 ft. to <br /> 50 ft. These improvements shall be shown on the improvement plans submitted for <br /> review and approval by the City Engineer. <br /> <br /> 28. The developer shall pay its prorata share of approximately $10,650, as determined by the <br /> City Engineer, of the future signalization of the intersection of Hansen Drive and Valley <br /> Avenue prior to the approval of the final map. <br /> <br /> 29. The design for the line, grade, and structural sections for the streets serving this <br /> development shall be subject to final review and approval by the City Engineer. <br /> <br /> 30. The developer shall construct vertical P.C.C. curbs and gutters within this development <br /> unless otherwise approved by the City Engineer. When the sidewalk is adjacent to the <br /> curb and gutter, they shall be poured monolithically. <br /> <br /> 31. The developer shall replace the sidewalk and curb/gutter along the project's Hansen Drive <br /> and Black Avenue frontages. Also, the developer shall slurry seal and restripe Hansen <br /> Drive and Black Avenue along the project frontage. These improvements shall be <br /> complete prior to the occupancy of the first residence in the proposed development. Any <br /> other damage to existing street improvements during construction on the subject property <br /> shall be repaired to the satisfaction of the City Engineer at full expense to the developer. <br /> <br /> P UD-95-4 City C~ncii <br /> <br /> <br />