Laserfiche WebLink
MISCELLANEOUS <br /> <br />48. At no time shall campers, trailers, motor homes, or any other vehicle be used as living or <br /> sleeping quarters on the construction site. All such vehicles shall be removed from the <br /> site at the end of each work day. <br /> <br />49. Portable toilets used during construction shall be kept as far as possible from existing <br /> residences and shall be emptied on a regular basis as necessary to prevent odor. <br /> <br />50. The site shall be kept free of fire hazards from the start of construction to final inspection. <br /> <br />51. All site improvements and house construction activities shall be limited to the hours of <br /> 8:00 a.m. to 5:00 p.m., Monday through Saturday. No construction activity shall be <br /> permitted on Sunday. All construction equipment must meet Department of Motor <br /> Vehicles (DMV) noise standards and shall be equipped with muffling devices. <br /> <br />52. Any proposed phasing of this development shall be depicted on the tentative tract map <br /> and shall include narrative explaining the proposed phasing. Unless a phasing plan for <br /> improvements is approved by the Planning Director, the developer shall complete all of <br /> the on-site improvements at one time (including all improvements around future building <br /> pads). All remaining pad areas shall be seeded and kept in a neat and weed-free manner <br /> at all times. <br /> <br />53. This approval does not guarantee the availability of sufficient water to serve the project. <br /> The City shall withhold building permits for the project if at the time building permits are <br /> applied for, mandatory water rationing is in effect, unless the City has adopted a water <br /> offset program and unless the developer is participating in the program. Notwithstanding <br /> the developer's participation in such a program, the City may withhold building permits if <br /> the City determines that sufficient water is not available at the time of application of <br /> building permits. <br /> <br />54. The developer acknowledges that the City of Pleasanton does not guarantee the <br /> availability of sufficient sewer capacity to serve this development by the approval of this <br /> case, and that the developer agrees and acknowledges that building pennit approval may <br /> be withheld if sewer capacity is found by the City not to be available. <br /> <br /> 55. This development plan shall be of no further validity and the applicant shall be required <br /> to submit the same or new development plan for City approval prior to development of <br /> the site in the event that the following occur: <br /> <br /> a. The applicant fails to receive growth management approval within 2 1/2 <br /> years of PUD approval, or <br /> <br /> P UD- 9 5-4 City Council <br /> <br /> <br />