My WebLink
|
Help
|
About
|
Sign Out
ORD 1655
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1601 - 1700
>
ORD 1655
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2004 12:07:20 PM
Creation date
3/9/1999 7:19:20 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1655
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
information. The architectural design of this building shall be submitted for the review and <br /> approval by the Planning Commission prior to the issuance of a building permit. The <br /> building shall be designed to complement the Chevys building in terms of architectural <br /> style, materials, and colors. <br /> <br />6. No restaurant use may locate in the future retail/commercial building shown on the <br /> attached plans, unless a finding is made at the discretion of the Planning Director that <br /> sufficient off-street parking will exist to accommodate the proposed use and that traffic <br /> will not impact North Pleasanton street intersections. In order to review whether this <br /> finding can be made, a parking and traffic study of the existing and proposed uses on the <br /> site shall be prepared at the expense of the owner of the center. <br /> <br />7. The applicants shall obtain all building and other applicable City permits for the project <br /> prior to the commencement of construction. <br /> <br />8. All relevant conditions of PUD-85-8-4D and PUD-85-8-4D-1M shall remain in full force <br /> and effect. <br /> <br />9. Final inspection by the Planning Department is required prior to occupancy. <br /> <br />10. The developer shall pay any and all fees.to which the property may be subject prior to <br /> issuance of building permits. The type and amount of the fees shall be those in effect at <br /> the time the building permit(s) is issued. <br /> <br />11. All ducts, meters, air conditioning equipment, and any other mechanical equipment shall <br /> be entirely screened from all view by the existing parapet wall. A plan showing all <br /> equipment and how it will be effectively screened from view using the existing parapet <br /> wall shall be shown on the plans submitted for issuance of a building permit. <br /> <br /> 12. All mechanical equipment shall be constructed in such a manner that noise emanating from <br /> it will not be perceptible beyond the property plane of the subject property in a normal <br /> environment for that zoning district. <br /> <br /> 13. Any damage to existing street improvements caused by the applicant and/or its contractors <br /> during construction on the subject property shall be repaired to the satisfaction of the City <br /> Engineer at full expense to the developer. This shall include slurry seal, overlay, or street <br /> reconstruction if deemed warranted by the City Engineer. <br /> <br /> 14. The applicant's contractor(s) shall obtain an encroachment permit from the City Engineer <br /> prior to moving any construction equipment onto the site. <br /> <br /> 15. All building and/or structural plans must comply with all codes and ordinances in effect <br /> before the Building Department will issue permits. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.