My WebLink
|
Help
|
About
|
Sign Out
ORD 1625
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1601 - 1700
>
ORD 1625
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2003 12:47:25 PM
Creation date
3/9/1999 6:41:53 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1625
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. the maximum number of employees on each shift; and <br /> <br /> 5. the typical time at which each employee arrives and <br /> leaves the workplace. <br /> <br /> Employers required to have a TSM Program shall not offer <br /> any special incentives or disincentives in addition to <br /> its regular TSM Program during the survey week. This <br /> limitation does not apply to activities undertaken by an <br /> employer in response to a Bay Area Air Quality Management <br /> District forecast exceedance day, e.g. the "Spare the <br /> Air" Campaign. <br /> <br />B. Employers of Fifty ~50) or More Employees - TSM <br /> Programs. In addition to fulfilling the survey report <br /> requirements, every employer of fifty (50) or more <br /> employees who begin work from 6:00 a.m. through <br /> 10:00 a.m. inclusive, at a single work site shall design, <br /> implement, and provide the Pleasanton Coordinator with a <br /> TSM Program designed to achieve the AVR goals and the <br /> reductions in peak period traffic generated by its <br /> employees as set forth in the staged goals of this <br /> ordinance (Section 17.24,070). <br /> <br /> 1. Every such existing employer shall submit and begin <br /> implementation of its TSM Program within two (2) <br /> months following the effective date of this <br /> ordinance. Every future employer shall submit a TSM <br /> Program Plan to the Pleasanton Coordinator and begin <br /> implementation of this TSM Program within two (2) <br /> months following issuance to such employer of a <br /> Zoning Certificate, if required, or, otherwise, <br /> within two (2) months following the date the employer <br /> opens for business. <br /> <br /> 2. The TSM Program shall include the following: <br /> <br /> a. Appointment of an employee as an Employee <br /> Transportation Coordinator (ETC) who shall be <br /> responsible for primary implementation of the TSM <br /> Program. Employers with multiple work sites may <br /> appoint one ETC for more than one site. <br /> <br /> (i) The ETC must complete a Bay Area Air <br /> Quality Management District-certified <br /> training curriculum within nine months of <br /> the effective date of this ordinance or <br /> within six months of appointment if <br /> appointed ETC after the initial nine month <br /> time frame. <br /> <br /> 8 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.