My WebLink
|
Help
|
About
|
Sign Out
ORD 1596
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1501 - 1600
>
ORD 1596
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2004 12:02:05 PM
Creation date
3/9/1999 5:34:04 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1596
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REVISED SITE DEVEIaPMENT CRITERIA <br /> <br /> T~mv-m <br /> <br /> SUMMARY OF SITE DEVELOPMENT CRITERIA <br /> <br /> MINIMUM MINIMUM <br />LOT MAXIMUM FLOOR MAXIMUM LANDSCAPE PARKING <br />PARCELS USE ~A~ AREA RATIO ~1) HEIGHT ~2~ RATIO ~3~ RATIO <br /> <br />1 1A CPD (3 STORY) SEE NOTE 5 55' 25% SEE NOTE 5 <br /> 1B,1E,1F CPD (3 STORY} SEE NOTE 5 55' 25% SEE NOTE 5 <br /> lC CPD (3 STORY) SEE NOTE 5 55' 25% SEE NOTE 5 <br /> 1D CPD (2 STORY) 25% 45' 25% SEE NOTE 5 <br /> <br />2 OGPD (2 STORY) 40% 55' 25% I PER 250 SQ. FT. <br /> OGPD (3 STORY) 45% 55' 25% i PER 250 SQ. FT. <br /> <br />3 OGPD (2 STORY) 40% 55' 25% i PER 250 SQ. FT. <br /> OGPD (3 STORY) 45% 55' 25% I PER 250 SQ. FT. <br /> <br />4 IPD (1 STORY) 35% 45' 20% i PER250 SQ. FT. <br /> (2 STORY) 40% <br /> <br />5 5A,5C CPD (3 STORY) SEE NOTE 5 55' 25% SEE NOTE <br /> 5B MOIPD SEE NOTE 7 SEE NOTE 7 55' SEE NOTE 7 SEE NOTE 7 <br /> <br />6 MOIPD SEE NOTE 7 SEE NOTE 7 85.5' SEE NOTE 7 SEE NOTE 7 <br /> <br />7 7A,7B MOIPD SEE NOTE 7 SEE NOTE 7 85.5' SEE NOTE 7 SEE NOTE 7 <br /> 7C,7D,7E MOIPD SEE NOTE 7 SEE NOTE 7 85~5' SEE NOTE 7 SEE NOTE 7 <br /> <br />8 8A,SB High Density SEE NOTE 6 N/A N/A N/A <br /> Residential <br /> <br />9 OMPD (5 STORY) 50% 72' 25% i PER 250 SQ. FT. <br /> <br /> 10 10A,10B MOIPD SEE NOTE 7 SEE NOTE 7 55' SEE NOTE 7 SEE NOTE 7 <br /> <br /> 11 11A,11C, IPD (1 STORY) 35% 45' 20% I PER 250 SQ. FT. <br /> llD,11E, <br /> & 11F <br /> llB (2 STORY) 40% 45' 20& I PER 250 SQ. FT. <br /> <br /> 12 12A IPD (1 STORY) 35% 45' 20% i PER 250 SQ. FT. <br /> 12B IPD (2 STORY) 40% 45' 20% I PER250 SQ. FT. <br /> <br /> - 1 - <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.