Laserfiche WebLink
85.) The applicant is responsible for implementing the following measures during all <br /> construction phases of the project: <br /> <br /> a. Gather all construction debris on a regular basis and place it in a dumpster or <br /> other container which is emptied or removed an a weekly basis. When <br /> appropriate, use tarps on the ground to collect fallen debris or splatters that could <br /> contribute to storm water runoff pollution. <br /> <br /> b. Remove all dirt, gravel, rubbish, refuse, and green waste from the street pavement <br /> and storm drains adjoining the site. Limit construction access routes onto the site <br /> and place gravel on them. Do not drive vehicles and equipment off paved or <br /> graveled areas during wet weather. Broom sweep the street pavement adjoining <br /> the project site on a daily basis. Scrape caked-on mud and dirt from these areas <br /> before sweeping. <br /> <br /> c. Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain inlet <br /> nearest the downstream side of the project site in order to retain any debris or dirt <br /> flowing in the storm drain system. Maintain and/or replace filter materials to <br /> ensure effectiveness and to prevent street flooding. <br /> <br /> d. Create a contained and covered area on the site for the storage of bags, cement, <br /> paints, oils, fertilizers, pesticides, or other materials used on the site that have the <br /> potential of being discharged into the storm drain system through being <br /> windblown or in the event of a material spill. <br /> <br /> e. Never clean machinery, equipment, tools, brushes, or rinse containers into a street, <br /> gutter, or storm drain. Ensure that concrete/gunite supply trucks or <br /> concrete/plaster operations do not discharge wash water into street, gutters, or <br /> storm drains. <br /> <br /> Page 13 <br /> <br /> <br />