Laserfiche WebLink
are to be indicated on the plan. Plans for custom lots are to be signed by a registered civil <br /> engineer. All residential plot plans shall show compliance with 2907(d) and 70012(d) of <br /> the Uniform Building Code. <br /> <br />57. The developer shall submit record tract grading plans showing: 1) the elevation of all four <br /> corners of the lot as well as the center of the lot, 2) all top and toe of slope elevations, and <br /> 3) the top and toe of all retaining wall elevations. The record grading plan is to be <br /> submitted to the Director of Building Inspection before the first house final. <br /> <br />58. All retaining walls higher than four feet from the top of the wall to the bottom of the <br /> footway shall be constructed of reinforced concrete or shall be an approved crib wall type. <br /> Calculations signed by a registered civil engineer shall accompany the wall plans. <br /> <br />59. The paving sections for the on-site parking and drive areas shall be designed on the basis <br /> of an R-Value test and a traffic index to carry the anticipated traffic loads. This design <br /> shall be subject to the approval of the Director of Building Inspection. The minimum <br /> paving section shall be 2" A.C. on 6" of A.B. The minimum A.C. pavement slope shall be <br /> 1%. For pavement slopes of less than 1%, the surface runoff shall be carried in a concrete <br /> gutter to an acceptable point of discharge. The minimum slope for concrete gutter shall be <br /> 0.5%. <br /> <br />60. A sanitary sewer sampling manhole shall be provided on the sanitary sewer lateral from the <br /> office building, unless otherwise waived by the Director of Building Inspection. <br /> <br /> 61. Prior to issuance of a building permit, the developer shall pay the applicable Zone 7 and <br /> City connection fees and water meter cost for any water meters, including irrigation <br /> meters. Additionally, the developer shall pay any applicable Dublin San Ramon Services <br /> District (DSRSD) sewer permit fee. <br /> <br /> 62. The developer shall pay any and all fees to which the property may be subject prior to the <br /> issuance of building permits. The type and amount of the fees shall be those in effect at <br /> the time the building permit is issued. <br /> <br /> FIRE DEPARTMENT <br /> <br /> 63. The development shall meet all requirements of the Pleasanton Fire Code (Chapter 20.24 <br /> of the Pleasanton Municipal Code). <br /> <br /> 64. The applicant shall keep the site free of fire hazards from the start ofhmber construction <br /> until the final inspection. <br /> <br /> 65. The developer shall ensure that fire protection facilities including, but not limited to, all <br /> surface roads, fire hydrants, and a water supply capable of furnishing the required fire <br /> flow is installed and serviceable prior to and during the time of construction framing. <br /> <br /> PUD-97-08 Page 10 <br /> <br /> <br />