Laserfiche WebLink
d. Create a contained and covered area on the site for the storage of bags, cement, <br /> paints, oils, fertilizers, pesticides, or other materials used on the site that have the <br /> potential of being discharged into the storm drain system through being <br /> windblown or in the event of a material spill. <br /> <br /> e. Never clean machinery, equipment, tools, brushes, or rinse containers into a street, <br /> gutter, or storm drain. Ensure that concrete/gunite supply trucks or <br /> concrete/plaster operations do not discharge wash water into street, gutters, or <br /> storm drains. <br /> <br />AP-97-10 (PUD-97-03) Conditions of Approval Page 15 of 15 <br /> <br /> <br />