Laserfiche WebLink
subcontractors and suppliers of materials and equipment. Construction site cleanup and <br /> control of construction debris shall also be addressed in this program. Failure to comply <br /> with the approved construction BMP my result in the issuance of correction notices. <br /> citations. or a project stop work order. <br /> <br />52. The applicant is responsible for implementing the following measures during all <br /> construction phases of the subject project: <br /> <br /> a.) Gather all construction debris on a regular basis and place them in a dumpster or other <br /> container which is emptied or removed on a weekly basis. When appropriate. use tarps <br /> on the ground to collect fallen debris or splatters that could contribute to storm water <br /> pollution. <br /> <br /> b.) Remove all dirt, grovel, rubbish, refuse, and green waste from the street pavement. <br /> and storm drains adjoining the project site. During wet weather avoid driving vehicles <br /> off paved areas. <br /> <br /> c.) Broom sweep the public street pavement adjoining the project site on a daily basis. <br /> Caked-on mud or din shall be scraped from these areas before sweeping. <br /> <br /> d.) Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain inlet <br /> nearest the downstream side of the project site in order to retain any debris or din flowing <br /> into the City storm drain system. Filter materials shall be maintained and/or replaced as <br /> necessary to ensure effectiveness and to prevent street flooding. Dispose of filter <br /> particles in the trash. <br /> <br /> e.) Create a contained and covered area on the site for the storage of bags, cement, paints, <br /> timable, oils, fertilizers, pesticides, or any other materials used on the project site that <br /> have the potential for being discharged to the storm drain system through being <br /> windblown or in the event Of a material spill. <br /> <br /> f.) Never clean machinery, tools, brushes. etc., or rinse containers into a street, gutter, or <br /> storm drain. <br /> <br /> g.) Ensure that concretctgun~te supply trucks or concretedplasterers operations do not <br /> discharge wash water into street gutters or drains. <br /> <br /> It) Construction access routes shall be limited to those approved by the City Engineer or <br /> Building Inspector and shall be shown on the approved grading plan. <br /> <br /> <br />