My WebLink
|
Help
|
About
|
Sign Out
ORD 1766
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1701 - 1800
>
ORD 1766
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:24:23 PM
Creation date
3/8/1999 5:08:13 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1766
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
33. The haul route for construction shall be submitted for the review and approval bv the <br /> Citv Engineer prior to an,,' work on the site. <br /> <br />34. The applicant shall submit a final Fading and drainage plan prepared bv a licensed <br /> civil engineer depicting all final grades and on-site drainage control measures. <br /> including concrete-lined V-ditches, to protect all cut and fill slopes from surface <br /> water overflow. This plan shall be subject to the review and approval of the City <br /> Engineer and/or the Director of Building Inspection prior to the issuance of any <br /> building permits. <br /> <br />35. Contractors shall also be required to cleanup mud and dust carried onto the streets <br /> by construction vehicles on a daily basis or as determined necessary. bv the City <br /> Engineer. <br /> <br />36. Storm drainage swales. gutters, inlets, outfalls. and channels not within the area of a <br /> dedicated public street or public service easement approved by the City Engineer <br /> shall be privately maintained by the property owners or through an association <br /> approved by the City. <br /> <br />37. Any damage to existing street improvements during construction on the subject <br /> property shall be repaired to the satisfaction of the City Engineer at full expense to <br /> the developer. This shall include slurry seal, overlay, or street reconstruction if <br /> deemed warranted by the City Engineer. <br /> <br /> 38. The applicant's contractoris) shall obtain an encroachment permit from the City <br /> Engineer prior to moving anv construction equipment onto the site. <br /> <br /> 39. The owner of this lot shall enter into an agreement to participate in the legal entity <br /> established with the owners of the lots in PUD-88-16 (Lots 1.2. and 3 of Parcel Map <br /> 6261 and Parcel A of Parcel Map 5791) for the purposes of maintenance and repair <br /> of the entire length of the private road, utility systems, and landscaping that serve <br /> both of these developments. This length shall extend from Foothill Road to its <br /> terminus at the hammerhead on this lot. Prior to the final inspection of this home, <br /> the pavement integrity of the Fire Department hammerhead on this property shall be <br /> deemed satisfactory by the City Engineer and Fire Marshal. <br /> <br /> Urban Runoff <br /> <br /> 40. The applicant shall include erosion control/storm water quality measures on the <br /> grading plan which shall specifically address measures to prevent soil, dirt, and <br /> debris from entering the storm drain system. Such measures may include, but are <br /> <br /> PUD-98-10 City Council <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.