Laserfiche WebLink
c. Install filter materials (such as sandbags. filter fabric. etc.) at the storm drain <br /> inlet nearest the downstream side of the project site in order to retain anv debris <br /> or dirt flowing in the storm drain system. Maintain and/or replace filter <br /> materials to ensure effectiveness and to prevent street flooding. <br /> <br /> d. Create a contained and covered area on the site for the storage of bags. cement, <br /> paints, oils, fertilizers, pesticides, or other materials used on the site that have <br /> the potential of being discharged into the storm drain system through being <br /> windblown or in the event of a material spill. <br /> <br /> e. Never clean machinery, equipment, tools, brushes. or rinse containers into a <br /> street, gutter, or storm drain. Ensure that concrete/gunite supply trucks or <br /> concrete/plaster operations do not discharge wash water into street, gutters, or <br /> storm drains. <br /> <br />44. The applicant shall include restoration of the natural slope on the Nelson property on <br /> the landscape plan submitted with the design review application for the house. <br /> <br /> PUD-98-10 City Council <br /> <br /> <br />