Laserfiche WebLink
Ordinance No. 1764 <br /> <br />Facilities Master Plan dated December 7, 1990 and the Public Facilities Technical Report <br />dated September 1998, and other improvements in connection therewith, as may be <br />determined by the City Council from time to time, which are not otherwise provided by, <br />or required of, development within the City pursuant to PMC Title 18 (Zoning), Title 19 <br />(Subdivisions), and Title 20 (Building and Construction). Public facilities shall also <br />include architectural, administrative, engineering, legal, planning, environmental and <br />other services required in connection with the implementation of this chapter and the <br />construction of the foregoing improvements. <br /> <br /> B. "Developer" means an individual or entity submitting an application for a <br />building permit or other entitlement for development. <br /> <br /> C. "Development" means: <br /> <br /> 1. New residential unit, including conversion of existing unit to >1 unit. <br /> <br /> 2. New commercial, office, and industrial development. <br /> <br /> 3. Additions to existing commercial, office and industrial development <br /> greater than 200 gross square feet. <br /> <br /> D. "Future growth" means the total amount of potential new development in the <br />City permitted under the General Plan. Future growth is expressed in terms of gross <br />square footage for industrial and commercial development, and in terms of the number of <br />dwelling units for residential development. <br /> <br /> E. "Gross floor area" has the same meaning as set forth in PMC section <br />18.18.100. <br /> <br />3.22.030 Applicability <br /> <br /> Except as otherwise expressly provided in this Chapter, the public facilities fee <br />required under this Chapter is payable with respect to each development within the City <br />for which a building permit or other entitlement for development is issued on or after the <br />effective date of the fee as adopted in the Master Fee Schedule. <br /> <br />3.22.040 Amount of Fee <br /> <br /> A. The amount of the fee shall be determined by the Building Department prior <br />to issuance of the building permit, based upon the Master Fee Schedule. <br /> <br /> Page 8 <br /> <br /> <br />