My WebLink
|
Help
|
About
|
Sign Out
ORD 1760
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1701 - 1800
>
ORD 1760
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:24:23 PM
Creation date
3/8/1999 4:55:27 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1760
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />subject to the review and approval of the Director of Building Inspection. The <br />project developer is responsible for ensuring that the contractor is aware of and im- <br />plements such measures. <br /> <br />70. All metal roofs shall be finished with rust-inhibitive paint. <br /> <br />71. The project developer shall submit a construction Best Management Practices <br />(BMP's) program for review and approval by the Planning Director prior to issu- <br />ance of building and/or grading permits. These BMP's shall be implemented by <br />the general contractor and all subcontractors and suppliers of materials and equip- <br />ment. Construction site cleanup and control of construction debris shall also be <br />addressed. Failure to comply with the approved construction BMP may result in <br />the issuance of correction notices, citations, or a stop work order. <br /> <br />72. The project developer is responsible for implementing the following measures dur- <br />ing all construction phases of the project: <br /> <br />a. Gather all construction debris on a regular basis and place it in a dumpster or <br />other container which is emptied or removed an a weekly basis. When ap- <br />propriate, use tarps on the ground to collect fallen debris or splatters that <br />could contribute to storm water runoff pollution. <br /> <br />b. Remove all dirt, gravel, rubbish, refuse, and green waste from the street <br />pavement and storm drains adjoining the site. Limit construction access <br />routes onto the site and place gravel on them. Do not drive vehicles and <br />equipment off paved or graveled areas during wet weather. Broom sweep the <br />street pavement adjoining the project site on a daily basis. Scrape caked-on <br />mud and dirt from these areas before sweeping. <br /> <br />c. Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain <br />inlet nearest the downstream side of the project site in order to retain any de- <br />bris or dirt flowing in the storm drain system. Maintain and/or replace filter <br />materials to ensure effectiveness and to prevent street flooding. <br /> <br />d. Create a contained and covered area on the site for the storage of bags, ce- <br />ment, paints, oils, fertilizers, pesticides, or other materials used on the site <br />that have the potential of being discharged into the storm drain system <br />through being windblown or in the event of a material spill. <br /> <br />City Council Conditions of Approval <br />Case PUD-97-14 (Chevron) <br /> <br />August 18, 1998 <br />Page 12 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.