My WebLink
|
Help
|
About
|
Sign Out
ORD 1772
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1701 - 1800
>
ORD 1772
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:24:23 PM
Creation date
3/3/1999 7:54:32 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1772
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ordinance No. 1772 <br />Page 10 <br /> <br /> owe shall be increased (or decreased) annually on January 1 by the most <br /> recent CPI increase (or decrease). <br /> <br /> C. Should an individual Funding Developer install, or agree to install, basic <br /> infrastructure improvements, the cost (verified or estimated) of which <br /> exceeds that Funding Developer's Area Development Impact Fees <br /> associated with its development, then any property owner (other than a <br /> subsequent Funding Developer) shall pay the Area Development Impact <br /> Fee as provided herein and that Fee shall be used to reimburse the Funding <br /> Developer. If more than one Funding Developer is entitled to <br /> reimbursement, the reimbursement shall be split proportionately based on <br /> the number of Funding Developers' lots. <br /> <br /> D. If a Funding Developer is entitled to reimbursement, either by a subsequent <br /> Funding Developer or by a property owner, prior to the construction costs <br /> being verified as provided in Section 3.40.055 E, then the reimbursement <br /> shall be based on the engineer's estimate of such costs as set forth in the <br /> Technical Report. <br /> <br /> 1. Should the verified construction costs be higher than the engineer's <br /> estimate, the Funding Developer shall be entitled to recover additional <br /> amounts from any subsequent Funding Developer who has paid the Funding <br /> Developer as provided in subsection B of this section; should the verified <br /> construction costs be less than the engineer's estimate, the Funding <br /> Developer shall refund any money to any subsequent Funding Developer <br /> who has paid the Funding Developer as provided in subsection B of this <br /> section; <br /> <br /> 2. Should the verified construction costs be higher than the engineer's <br /> estimate, the Funding Developer shall not be entitled to recover additional <br /> amounts from any property owner who has reimbursed the Funding <br /> Developer as provided in subsection C of this section; should the verified <br /> construction costs be less than the engineer's estimate, the Funding <br /> Developer shall have no obligation to refund any money to any property <br /> owner who has already reimbursed the Funding Developer as provided in <br /> subsection C of this section. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.