My WebLink
|
Help
|
About
|
Sign Out
ORD 1757
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1701 - 1800
>
ORD 1757
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:24:23 PM
Creation date
3/2/1999 7:52:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1757
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
74. All drive aisles shall be signed for no parking except in designated parking areas. <br /> <br />75. The applicant shall grant an easement to the City over those parcels needed for public <br /> service easements (P.S.E.) and which are approved by the City Engineer or other <br /> easements which may be designated by the City Engineer. <br /> <br />76. The design for the line, grade, and structural sections for the streets serving this <br /> development shall be subject to final review and approval by the City Engineer. <br /> <br />77. The applicant shall construct vertical P.C.C. curbs and gutters within this development <br /> unless otherwise approved by the City Engineer. When the sidewalk is adjacent to the <br /> curb and gutter, they shall be poured monolithically. <br /> <br />78. All existing wells on the site shall be removed or sealed, filled and abandoned pursuant to <br /> Alameda County Ord. 73-68, prior to the start of grading operations unless Zone 7 retains <br /> specific wells for observation wells, or special approval is obtained from the City <br /> Engineer for temporary use of an existing well for construction water. Any wells <br /> designated for abandonment or any wells, encountered during construction, are to be <br /> destroyed in accordance with a permit obtained from Zone 7. <br /> <br />79. All existing septic tanks or holding tanks shall be removed or sealed, filled, and <br /> abandoned, pursuant to the requirements of the Alameda County Department of Health <br /> Services. <br /> <br />80. The haul route for all materials to and from this development shall be approved by the <br /> City Engineer prior to the issuance of an encroachment permit. <br /> <br />8 1. The applicant shall include erosion control measures on the final grading plan, subject to <br /> the approval of the City Engineer. The applicant is responsible for ensuring that the <br /> contractor is aware of such measures. All cut and fill slopes shall be revegetated and <br /> stabilized as soon as possible after completion of grading, in no case later than <br /> October 15. No grading shall occur between October 15 and April 15 unless approved <br /> erosion control measures are in place, subject to the approval of the Building Department. <br /> Such measures shall be maintained until such time as permanent landscaping is in place. <br /> <br />82. The developer shall submit a dust control plan or procedure as part of the improvement <br /> plans. Gray water shall be used for dust control or grading activities. This water may be <br /> obtained from the Dublin San Ramon Services District (DSRSD) Waste Water Treatment <br /> Plant at 7399 Johnson Drive, Pleasanton, unless otherwise approved by the City <br /> Engineer. <br /> <br />83. Storm drainage swales, gutters, inlets, outfalls, and channels not within the area of a <br /> dedicated public street or public service easement approved by the City Engineer shall be <br /> <br /> 10 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.