My WebLink
|
Help
|
About
|
Sign Out
PC 99-22
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1999
>
PC 99-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:32:52 AM
Creation date
10/24/2001 6:16:07 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
3/10/1999
DOCUMENT NO
PC 99-22
DOCUMENT NAME
PUD-98-16
NOTES
HAPPY VALLEY
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Resolution No. PC-99-22 <br />Page 9 <br />32. Final inspection by the Planning Department is required prior to occupancy. <br /> <br />33. <br /> <br />If archeological materials are uncovered during grading, trenching, or other on-site <br />excavation, all work on site shall be stopped and the City immediately notified. The <br />county coroner and the Native American Heritage Commission shall also be notified and <br />procedures followed as required in Appendix K of the California Environmental Quality <br />Act. A similar note shall appear on the improvement plans. <br /> <br />34. <br /> <br />Portable toilets used during construction shall be kept as far as possible from existing <br />residences and shall be emptied on a regular basis as necessary to prevent odor. <br /> <br />35. <br /> <br />The applicant shall work with the Pleasanton Unified School District and the City <br />Planning Director to develop a program, in addition to the school impact fees required by <br />State law and local ordinance, to off-set this project's long-term effect on school facility <br />needs in Pleasanton. This program shall be designed to fund school facilities necessary to <br />off-set this project's reasonably related effect on the long-term need for expanded school <br />facilities to serve new development in Pleasanton. The method and manner for the <br />provision of these funds and/or facilities shall be approved by the City and in place prior <br />to (approval of the final map) (issuance of building permits). In no event shall <br />construction commence unless the above method and manner for the provision of these <br />funds and/or facilities has been approved by the City. <br /> <br />36. <br /> <br />This development plan shall be of no further validity and the applicant shall be required <br />to submit the same or new development plan for City approval prior to development of <br />the site in the event that the applicant fails to record a final map within two years of PUD <br />approval. <br /> <br />37. <br /> <br />The developer acknowledges that the City of Pleasanton does not guarantee the <br />availability of sufficient sewer capacity to serve this development by the approval of this <br />case, and that the developer agrees and acknowledges that building permit approval may <br />be withheld if sewer capacity is found by the City not to be available. <br /> <br />38. <br /> <br />This approval does not guarantee the availability of sufficient water to serve the project. <br />The City shall withhold building permits for the project if at the time building permits are <br />applied for, mandatory water rationing is in effect, unless the City has adopted a water <br />offset program and unless the developer is participating in the program. Notwithstanding <br />the developer's participation in such a program, the City may withhold building permits if <br />the City determines that sufficient water is not available at the time of application of <br />building permits. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.