Laserfiche WebLink
Resolution No. PC-99-20 <br />Page 9 <br /> <br />27. <br /> <br />28. <br /> <br />29. <br /> <br />30. <br /> <br />31. <br /> <br />32. <br /> <br />Prior to occupancy, the landscape architect shall certify in writing to the Planning <br />Director that the landscaping has been installed in accordance with the approved <br />landscape and irrigation plans with respect to size, number, and species of plants and <br />overall design concept. <br /> <br />Approved colors shall be stated on the plans submitted for issuance of building permits. <br /> <br />All backflow prevention devices installed with the development shall be painted forest <br />green (Pantone Color System Number 357) and shall be screened from view from public/ <br />private streets. Screens shall consist of berms, walls, or landscaping satisfactorily <br />integrated into the landscape plan. Landscape screens shall include shrubbery designed <br />by species and planting density to establish a complete screen within one year from the <br />date of planting. Weather protection devices such as measures to protect pipes from <br />freezing shall require approval by the Planning Director prior to use; at no time shall <br />fabric or other material not designed and/or intended for this purpose be wrapped around <br />or otherwise placed on these devices. All backflow prevention devices shall be shown on <br />the plans submitted for issuance of building permits together with screening mechanism <br />and/or weather protection devices. Proposed screening and weather protection devices <br />shall be reviewed for conformity to these requirements and approved by the Planning <br />Director prior to issuance of a building permit. <br /> <br />Only modular newspaper dispensers accommodating more than one newspaper shall be <br />allowed outside of buildings within the development. The design of these dispensers <br />shall be approved by the Planning Director. Dispensers within the public right-of-way <br />shall require an encroachment permit by the Engineering Department. <br /> <br />The applicant's geotechnical consultant shall review and approve all foundation and <br />drainage geotechnical aspects of the final development plans to ensure that his or her <br />recommendations have been properly incorporated into the development. The consultant <br />shall certify by writing on the plans or as otherwise acceptable to the Director of Building <br />Inspection that the final development plan is in conformance with the geotechnical <br />consultant's recommendations. <br /> <br />The applicant shall arrange and pay for the geotechnical consultant to inspect and approve <br />all foundation and drainage geotechnical aspects of project construction. The consultant <br />shall be present on site during grading and excavation operations. The results of the <br />inspections and the as-built conditions of the project shall be certified in writing by the <br />geotechnical consultant for conformance to the approved plans and geotechnical report <br />and submitted to the City Engineer and Director of Building Inspection for review and <br />approval prior to occupancy. <br /> <br /> <br />