Laserfiche WebLink
Resolution No. PC-99-20 <br />Page 14 <br />67. The applicant is responsible for implementing the following measures during all <br /> construction phases of the subject project: <br /> <br />a.) Gather all construction debris on a regular basis and place them in a dumpster or other <br />container which is emptied or removed on a weekly basis. When appropriate, use tarps <br />on the ground to collect fallen debris or splatters that could contribute to storm water <br />pollution. <br /> <br />b.) Remove all dirt, gravel, rubbish, refuse, and green waste from the street pavement, <br />and storm drains adjoining the project site. During wet weather avoid driving vehicles <br />off paved areas. <br /> <br />c.) Broom sweep the public street pavement adjoining the project site on a daily basis. <br />Caked-on mud or dirt shall be scraped from these areas before sweeping. <br /> <br />d.) Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain inlet <br />nearest the downstream side of the project site in order to retain any debris or dirt flowing <br />into the City storm drain system. Filter materials shall be maintained and/or replaced as <br />necessary to ensure effectiveness and to prevent street flooding. Dispose of filter <br />particles in the trash. <br /> <br />e.) Create a contained and covered area on the site for the storage of bags, cement, paints, <br />flammable, oils, fertilizers, pesticides, or any other materials used on the project site that <br />have the potential for being discharged to the storm drain system through being <br />windblown or in the event of a material spill. <br /> <br />f.) Never clean machinery, tools, brushes, etc., or rinse containers into a street, gutter, or <br />storm drain. <br /> <br />g.) Ensure that concrete/gunite supply trucks or concrete/plasterers operations do not <br />discharge wash water into street gutters or drains. <br /> <br />h.) Construction access routes shall be limited to those approved by the City Engineer or <br />Building Inspector and shall be shown on the approved grading plan. <br /> <br />68. <br /> <br />The applicant shall install structural control, such as an oil/water separator, sand filter, or <br />approved equal in the parking lot to intercept and pretreat storm water prior to reaching <br />the storm drain. The design, locations, and a schedule for maintaining the separator shall <br />be submitted to the City Engineer/Director of Building Inspection for review and <br />approval prior to issuance of building permits. The structural control shall be cleaned at <br />least twice a year: once immediately prior to October 1 and once in January. The <br />applicant shall enter into a maintenance agreement for the oil/water separator with the <br />City. <br /> <br /> <br />