Laserfiche WebLink
Resolution No. PC-99-20 <br />Page 11 <br /> <br />42. <br /> <br />43. <br /> <br />44. <br /> <br />45. <br /> <br />46. <br /> <br />47. <br /> <br />48. <br /> <br />49. <br /> <br />All building and/or structural plans must comply with all codes and ordinances in effect <br />before the Building Department will issue permits. <br /> <br />The applicant shall submit a building survey and/or record of survey and a site <br />development plan in accordance with the provisions of Chapter 18.68 of the Municipal <br />Code of the City of Pleasanton. These plans shall be approved by the Director of <br />Building Inspection prior to the issuance of a building permit. The site development plan <br />shall include all required information to design and construct site, grading, paving, <br />drainage, and utilities. Specific items to be indicated on the site development plan <br />necessary to construct the improvements are to be in accordance with the City of <br />Pleasanton Private Development Design Guidelines adopted April 15, 1986. <br /> <br />The paving sections for the on-site parking and drive areas shall be designed on the basis <br />of an R-Value test and a tratTlc index to carry the anticipated traffic loads. This design <br />shall be subject to the approval of the Director of Building Inspection. The minimum <br />paving section shall be 2" A.C. on 6" of A.B. The minimum A.C. pavement slope shall <br />be 1%. For pavement slopes of less than 1%, the surface runoff shall be carried in a <br />concrete gutter to an acceptable point of discharge. The minimum slope for concrete <br />gutter shall be 0.5%. <br /> <br />A sanitary sewer sampling manhole shall be provided on each of the sanitary sewer <br />lateral from each building, unless otherwise waived by the Director of Building <br />Inspection. <br /> <br />Prior to issuance of a building permit, the applicant shall pay the applicable Zone 7 and <br />City connection fees and water meter cost for any water meters, including irrigation <br />meters. Additionally, the developer shall pay any applicable DSRSD sewer permit fee. <br /> <br />The applicant shall submit two copies of the site soils report to the Director of Building <br />Inspection for review and approval prior issuance of a grading or building permit. <br /> <br />Building and sims plans are to be submitted to the Building Department on computer disk <br />in a format approved by the Director. Digitized information shall be submitted before <br />requesting a final inspection and should reflect as-built situs and architectural information <br />as approved by the Director. <br /> <br />Fire <br /> <br />The applicant shall install an automatic fire suppression system (i.e., fire sprinklers) in <br />the building, the design of which shall be submitted for review and approval by the <br />Building and Fire Department prior to issuance of building permits. <br /> <br /> <br />