Laserfiche WebLink
paved sur~ces) shall be ~'ansporl~d to installation <br />an approval storm drain system. No <br />collected water shall be allowed to <br />diseherge onto project slopes. <br />All geoteellnical-ralatad improvements Individual At time of At, er City Pleasanton Public <br />completed as pert of new development Homeowner consU'uction inspects Works DeparUnant <br />in this ere~ shall be included within the installation <br />scol~e oftbe Geologic Hazards <br />Ab~temenl District, including <br />mollitorin~, nmintonance, liability, etc., <br />developed for Phases I and 2 of the <br />O~ Tree Farm subdivision. <br />For any pr~ improvemants, Individual Prior to permit Al~r City Pleasanton Public <br />including r~sidances, accessory Homeowner issuance or inspects Works and Planning <br />slnlctures, l~ools, e~c., proposed to be discretionary DeperUnents <br />constructed within this geotechnical review <br />seti~ck ~ a geotecimical analysis approval <br />may be required to be submit~d by the <br />pro~erW owner at the discretion of the <br />Planning Director and City Engineer. <br />The pix~*~y owner shall be <br />resllOns~l~ for hiring a geologist to <br />per[orm th~ nocessary geotechnical <br />analysis and submitting it for the <br />review and appi'oval of the Pl~mning <br />Dir~tor and City Engineer. If the City <br />determines that the analysis needs to be <br />reviewed by a ~ reviewer, the <br />prollerty owner shall be responsible for <br />reimbursin~ the City for the cost of all <br />~eer review services it deems <br />necessary. The property owner shall be <br />responsible for inonrporating all <br />rectammended mitiff,~tions and <br />req~iremems r~sulting f~om the City's <br />revil~w into the proposed design and <br />ensm'ing that these are completed. <br /> <br /> <br />