My WebLink
|
Help
|
About
|
Sign Out
PC 2000-54
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2000
>
PC 2000-54
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:32:49 AM
Creation date
8/22/2001 5:04:36 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
8/23/2000
DOCUMENT NO
PC 2000-54
DOCUMENT NAME
PUD-81-30-82D
NOTES
Charter Properties
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Resolution No. PC-00-54 <br />Page 12 <br /> <br />by the general contractor and all subcontractors and suppliers of materials and <br />equipment. Construction site cleanup and control of construction debris shall also <br />be addressed. Failure to comply with the approved construction BMP may result <br />in the issuance of correction notices, citations, or a stop work order. The project <br />developer is responsible for implementing the following measures during all <br />construction phases of the project: <br /> <br />Gather all construction debris on a regular basis and place it in a dumpster <br />or other container which is emptied or removed an a weekly basis. When <br />appropriate, use tarps on the ground to collect fallen debris or splatters that <br />could contribute to storm water runoffpollution. <br /> <br />Remove all dirt, gravel, rubbish, refuse, and green waste from the street <br />pavement and storm drains adjoining the site. Limit construction access <br />routes onto the site and place gravel on them. Do not drive vehicles and <br />equipment off paved or graveled areas during wet weather. Broom sweep <br />the street pavement adjoining the project site on a dally basis. Scrape <br />caked-on mud and dirt from these areas before sweeping. <br /> <br />Co <br /> <br />Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain <br />inlet nearest the downstream side of the project site in order to retain any <br />debris or dirt flowing in the storm drain system. Maintain and/or replace <br />filter materials to ensure effectiveness and to prevent street flooding. <br /> <br />Create a contained and covered area on the site for the storage of bags, <br />cement, paints, oils, fertilizers, pesticides, or other materials used on the site <br />that have the potential of being discharged into the storm drain system <br />through being windblown or in the event of a material spill. <br /> <br />e. Never clean machinery, equipment, tools, brushes, or rinse containers into a <br /> street, gutter, or storm drain. <br /> <br />Ensure that concrete/gunite supply tracks or concrete/plaster operations do <br />not discharge wash water into street, gutters, or storm drains. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.