Laserfiche WebLink
eled areas during wet weather. Broom sweep the street pavement adjoining the proj- <br />ect site on a daily basis. Scrape caked-on mud and dirt fi.om these areas before <br />sweeping. <br /> <br />Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain inlet <br />nearest the downstream side of the project site in order to retain any debris or dirt <br />flowing in the storm drain system. Maintain and/or replace filter materials to ensure <br />effectiveness and to prevent street flooding. <br /> <br />Create a contained and covered area on the site for the storage of bags, cement, <br />paints, oils, fertilizers, pesticides, or other materials used on the site that have the <br />potential of being discharged into the storm drain system through being windblown <br />or in the event ora material spill. <br /> <br />Never clean machinery, equipment, tools, brushes, or rinse containers into a street, <br />gutter, or storm drain. <br /> <br />Ensure that concretedgunite supply tracks or concrete/plaster operations do not dis- <br />charge wash water into street, gutters, or storm drains. <br /> <br />< END> <br /> <br />Page 10 <br /> <br /> <br />