My WebLink
|
Help
|
About
|
Sign Out
PC 2000-48
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2000
>
PC 2000-48
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:32:48 AM
Creation date
8/22/2001 4:48:59 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
8/1/2009
DOCUMENT NO
PC 2000-48
DOCUMENT NAME
PUD-02
NOTES
Bernal Property
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
75. <br /> <br />Th~projeot developer is responsible for implementing the fei .l~wing measures during all <br />construction phases of the project: <br /> <br />Gather all coi~lstruction debris on a regular basis and place it in a dumpster or other <br />container which i~ emptied i~r removed an a weekly basis. When appropriate, use <br />tarps on the ~round to colle~ fallen debris or splatiers that coUld contribute to storm <br />water runoffpollution. · <br /> <br />Remove all dirt, gravel, rubbish, refuse, and green waste .from the st~et pavement <br />and storm drains adjoining the site. Limit construction access routes onto the site <br />and place gravel on them. Do not drive vehicles and equipment off paved or grav- <br />eled areas during wet weather. Broom sweep the stx~t pa~/~nent adjoining the proj- <br />ect site on a daily basis. Scrape caked-on mud and dirt from these greas before <br />sweeping. ' <br /> <br />Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain inlet <br />nearest the downstream side of the project site in order to retain any debris or dirt <br />flowing in 'file storm drain system. Maintain and/or replace filter materials to ensure <br />effectiveness and to prevent street fiooding. <br /> <br />Create a contained and covered area on the site for the storage of bags, cement, <br />palnt~ oiL% fertilizers, pesticides, or other materials used on the site that have the <br />potential of being discharged into the storm drain system through being windblown <br />or in the event cfa material spill. <br /> <br />e. Never clean machinery, equipment, tools, brushes, or rinse containers into a street, <br /> gutter, or storm drain. <br /> <br />Ensure that concrcte/gunite supply trucks or concrete/plaster operations do not dis- <br />charge wash water into street, gutters, or storm drains. <br /> <br /><END> <br /> <br />~.lab~ "c'; sl,-o$-o~/~,ut~.o~ ~4uga~t s, 2ooo <br />GItC ~F.~M. IRvt370nS. LLC ' i Pa~t 14~f14 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.