Laserfiche WebLink
Resolution No. PC-00-32 <br />Page 13 <br /> <br />water must be collected and discharged to the sanitary sewer, subject to approval <br />of the Dublin-San Ramon Services District (DSRSD). <br /> <br />74. <br /> <br />The project developer shall label all on-site storm drain inlets with the wording, <br />"No Dumping -- Drains to Bay" using City-approved methods and materials. On- <br />site storm drain facilities shall be cleaned a minimum of twice a year as follows: <br />immediately prior to October 15 and once in January. Additional cleaning may be <br />required if found necessa~ by the City Engineer/Director of Building Inspection. <br /> <br />75. <br /> <br />Prior to the commencemem of any clearing, grading, or excavation, the project <br />developer shall submit a copy of the State Water Resources Control Board Notice <br />of Intent (NOD for coverage under the State Construction Storm Water General <br />Permit. <br /> <br />76. Alt metal roofs, if used, shall be finished with rust-inhibitive palm. <br /> <br />77. <br /> <br />The project developer shall submit a construction Best Management Practices <br />(BMP's) program for review and approval by the Planning Director prior to <br />issuance of building and/or grading permits. These BMP's shall be implemented <br />by the general contractor and all subcontractors and suppliers of materials and <br />equipment. Construction site cleanup and control of construction debris shall also <br />be addressed. Failure to comply with the approved construction BMP may result <br />in the issuance of correction notices, citations, or a stop work order. <br /> <br />78. <br /> <br />The project developer is responsible for implementing the following measures <br />during all construction phases of the project: <br /> <br />ao <br /> <br />Gather all construction debris on a regular basis and place it in a dumpster <br />or other container which is emptied or removed an a weekly basis. When <br />appropriate, use tarps on the ground to collect fallen debris or splatters that <br />could contribute to storm water runoff pollution. <br /> <br />bo <br /> <br />Remove all dirt, gravel, rubbish, refuse, and green waste from the street <br />pavement and storm drains adjoining the site. Limit construction access <br />routes onto the site and place gravel on them. Do not drive vehicles and <br />equipment off paved or graveled areas during wet weather. Broom sweep <br />the street pavement adjoining the project site on a daily basis. Scrape <br />caked-un mud and dirt from these areas before sweeping. <br /> <br />Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain <br />inlet nearest the downstream side of the project site in order to retain any <br />debris or dirt flowing in the storm drain system. Maintain and/or replace <br />filter materials to ensure effectiveness and to prevent street flooding. <br /> <br />Create a contained and covered area on the site for the storage of bags, <br />cement, paints, oils, fertilizers, pesticides, or other materials used on the site <br />that have the potential of being discharged into the storm drain system <br />through being windblown or in the evem of a material spill. <br /> <br /> <br />