My WebLink
|
Help
|
About
|
Sign Out
PC 2000-23
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2000
>
PC 2000-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:32:45 AM
Creation date
8/15/2001 4:59:11 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
4/12/2000
DOCUMENT NO
PC 2000-23
DOCUMENT NAME
PUD-99-03
NOTES
Kolb/Miller
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Resolution No. PC-2000-23 <br />Page 23 <br /> <br />October 15 and April 15 unless approved erosion control/storm water quality <br />measures are in place, subject to the approval of the City Engineer/Director of <br />Building Inspection. Such measures shall be maintained until such time as <br />permanent landscaping is place. <br /> <br />96. <br /> <br />The project developer shall submit a construction Best Management Practices <br />(BMP's) program for review and approval by the Planning Director prior to <br />issuance of building and/or grading permits. These BMP's shall be implemented <br />by the general contractor and all subcontractors and suppliers of materials and <br />equipment. Construction site cleanup and control of construction debris shall also <br />be addressed. Failure to comply with the approved construction BMP may result <br />in the issuance of correction notices, citations, or a stop work order. <br /> <br />97. <br /> <br />The project developer is responsible for implementing the following measures <br />during all construction phases of the project: <br /> <br />Gather all construction debris on a regular basis and place it in a dumpster or other <br />container which is emptied or removed an a weekly basis. When appropriate, use <br />tarps on the ground to collect fallen debris or splatters that could contribute to storm <br />water runoff pollution. <br /> <br />Remove ail dirt, gravel, rubbish, refuse, and green waste from the street pavement <br />and storm drains adjoining the site. Limit construction access routes onto the site <br />and place gravel on them. Do not drive vehicles and equipment offpaved or <br />graveled areas during wet weather. Broom sweep the street pavement adjoining the <br />project site on a daily basis. Scrape caked-on mud and dirt from these areas before <br />sweeping. <br /> <br />Install filter materiais (such as sandbags, filter fabric, etc.) at the storm drain inlet <br />nearest the downstream side of the project site in order to retain any debris or dirt <br />flowing in the storm drain system. Maintain and/or replace filter materials to ensure <br />effectiveness and to prevent street flooding. <br /> <br />Create a contained and covered area on the site for the storage of bags, cement, <br />paints, oils, fertilizers, pesticides, or other materiais used on the site that have the <br />potentiai of being discharged into the storm drain system through being windblown <br />or in the event of a materiai spill. <br /> <br />Never clean machinery, equipment, tools, brushes, or rinse containers into a street, <br />gutter, or storm drain. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.