Laserfiche WebLink
ITEM qUANTITY UNIT <br /> <br />DESCRIPTION <br /> <br />ELECTRIC DISTRIBUTION AND LIGHTING SYSTEM <br />1. ' 64 Each Concrete foundation for steel pole <br /> <br />2. 12 Each <br />3. 30 Each <br />4. 96 Each <br />5. 3,024 Lin Ft <br />6. 633 Lin Ft <br />7. 4.m624 Lin Ft <br />8. 2,118 Lin Ft <br />9. 1 Each <br /> <br />17"x30" Splice Box w/ground rod <br />24"x36" Splice Box w/ground rod <br />13"x24" Splice Box w/ground rod <br />l-l/2" Plastic ABS {no neutral) <br />3" Plastic ABS w/1 #0 Bare Copper Neutral <br />2" Plastic ABS w/1 #4 Bare Copper Neutral <br />2" Plastic ABS w/1 #2 Bare Copper Neutral <br />30"x48"x31" Splice Box w/ground rod <br /> <br />UNLIT PRICE <br /> <br />110.00 <br /> 80.00 <br /> 90.00 <br /> 50.00 <br /> 1.00 <br /> 1.50 <br /> 1.10 <br /> 1.15 <br />300.00 <br /> <br />-5 <br /> ToTA.L ..... <br /> <br />7,040.00 <br />960.00 <br />2,700.00 <br />4,800.00 <br />3,024.00 <br />949.50 <br />5,086.40 <br />2,435.70 <br />300.00 <br /> <br />CONSTRUCTION COSTS - ITEM B <br /> <br />Penalty charged against construction cost <br />due to default in time of completion <br /> <br />TOTAL CONSTRUCTION COST - ITEM B: <br /> <br />ACQUISITION pF CAPACITY <br />1. City sew;er pump reimbursement <br />2. Purchase of capacity in Arroyo del Valle <br /> Sanitary Sewer <br /> <br />$ 7,755.44 <br />52t343.03 <br /> <br />$661,841.75 <br /> <br /> - 600...00 <br />$661,241.75 <br /> <br />$60,098.47 <br /> <br />TOTAL CONSTRUCTION AND ACQUISITION COSTS: <br /> <br />INCIDENTAL EXPENSES: <br />1. Civil Engln~lng <br /> (a) Subdivision fee <br /> (b) Assess~nt Fee <br />2. Soils Engineering <br />3. Underground teleptmne fee <br />4. City Inspection Fee <br />5. City Plan Checking Fee <br />6. City Water Fee <br />7. City Sewer Fee <br />8. City Annex Fee <br />9. City AOninistrative Overhead <br />10. City Bond Service Charge <br />11. Legal Fees <br />12. Publication costs, cost of printing bonds, <br />bond register, etc. <br />13. Subdivision Bond Premium <br /> <br />$ 85,871.99 <br /> 12,196.02 <br /> 20,466.27 <br /> 15,527.45 <br /> 25,665.46 <br /> 457.00 <br /> 6,888.21 <br /> 9,804.30 <br /> 7,048.75 <br /> 6,516.65 <br /> 4,760.00 <br /> 27,457.00 <br /> <br /> 1,614.47 <br /> 6.550.00 <br />TOTAL INCIDENTAL EXPENSES: <br /> <br />$859,658.18 <br /> <br />$230,823.57 <br /> <br /> <br />