IT~ qu~.TITY UN.IT DESCRIPTION
<br />
<br />B..CONSTRUCTION COSTS (UNITS NO. 2, 3, and 4)
<br />
<br />UNIT PRICE
<br />
<br />STREET WORK
<br />1. 174'~,345 Sq Ft
<br />2. 112,597 Sq Ft
<br />3. 34,889 Sq Ft
<br />4. 112,351Sq Ft
<br />5. 215,340 Sq Ft
<br />6. 12,389 Sq Ft
<br />7. 105,993 Sq Ft
<br />8. 144,359 Sq Ft
<br />9. 86,173 Sq Ft
<br />10. 59,660 Sq Ft
<br />11. 364,929 Sq Ft
<br />12. 62,977 Sq Ft
<br />13. 49,064 Sq Ft
<br />14. 104,710 Sq Ft
<br />15. 270 Lin Ft
<br />16. 71 Each
<br />
<br />17.
<br />18.
<br />19.
<br />20.
<br />21.
<br />22.
<br />23.
<br />
<br /> 390 Each
<br /> 12Each
<br />Lump Sum
<br /> 2,872.5 Lin
<br /> 5 Each
<br /> 1 Each
<br />Lump Sum
<br />
<br />Ft
<br />
<br />24. 1,056 Lin Ft
<br />25. Lum~p Sum
<br />26. 60 Lin Ft
<br />27. Lu~ Sum
<br />
<br />28. Lump Sum
<br />
<br />Grading between property lines 0.175
<br />8" Class II, Agg. Base 0.13
<br />7" Class 11, Agg. Base 0.11
<br />6" Class 1I, Agg. Base O,.lO
<br />5" Class II, Agg. Base 0.08
<br />4" Class 1I, Agg. Base 0.07
<br />6" Agg. Subbase 0.05
<br />8" Agg. S~bbase 0.08
<br />4" Ag9. Subbase 0.04
<br />2-1/2" P.M.S. 0.11
<br />2" P.M.S. 0.10
<br />3" P.M.S. 0.12
<br />4" Cushion under curb & gutter 0.05
<br />3" Cushion under sidewalk 0.05
<br />Barricades 3.00
<br />Monuments (Std. City) 35.00
<br />Street trees 8.00
<br />Street signs 40.00
<br />Channel construction -
<br />6 ft High Chain Link Fence 1.70
<br />W21R Dead End Sign 20.00
<br />Cap & Seal existing well 300.00
<br />Removal of all existing structures, foundations
<br />and fences
<br />6 ft High redwood fence 2.50
<br />Cement Treated Base
<br />"Ditch to Drain" Ditch 0.50
<br />Relocate Existing Driveway and Chain Link Fence
<br />Gate
<br />Pad and Street Re-grading -
<br />
<br />CONCRETE
<br />.T7-----24,532 Lin Ft
<br />2. 38,162 Sq Ft
<br />3. 66,551Sq Ft
<br />4. 43 Each
<br />5. 27 Each
<br />6. 1 Each
<br />7. 4 Each
<br />8. 18 Each
<br />9. 192 Each
<br />10. 3 Each
<br />11. 1,603 Lin Ft
<br />12. 1 Each
<br />13. 4 Each
<br />14. Lump Sum
<br />15. 511 Lin Ft
<br />16. Lump Sum
<br />
<br />Vertical PCC Curb & Gutter
<br />4 ft Std. Sidewalk
<br />4.5 ft Monolithic sidewalk
<br />Drivew~ approaches
<br />Drop Inlets
<br />4" Meter BOX
<br />2" Meter Box
<br />1" Meter Box
<br />3/4" Meter Box
<br />Field type inlet
<br />PCC Rear Yard Gutter
<br />Concrete Neadwall
<br />Sacked rip-rap
<br />Retaining Wall
<br />24" PCC Rear Yard Gutter
<br />Curb & Gutter Dowelling
<br />
<br />1.60
<br />0.36
<br />0.36
<br />50.00
<br />300.00
<br />50.00
<br />20.00
<br />10.00
<br />10.00
<br />120.00
<br />1.10
<br />1,000.00
<br />700.00
<br />
<br />1.00
<br />
<br />-3
<br />
<br />$130,435.38
<br />14,637.61
<br />3,837.79
<br />11,236,10
<br />17,227.20
<br />667.23
<br />5,299.66
<br />11,546.72
<br />3,446.92
<br />6,662.60
<br />36,492.90
<br />7,567.24
<br />2,453.20
<br />5,235.~0
<br /> ~0.00
<br /> 2,485.00
<br /> 3,120.00
<br />
<br /> 1,500,00
<br /> 4,883.25
<br /> 100.00
<br /> 300.00
<br />
<br />4,000.00
<br />2,640.00
<br />2,185.01
<br />
<br /> 440.86
<br /> , T, 585.47:
<br />$281,396,63
<br />
<br />39,251 · 20
<br />13,738.32
<br />23,968.36
<br />2,160.00
<br />
<br /> 50,00
<br /> 80.00
<br />
<br /> 1,920.00
<br />
<br /> 1,763,30 :
<br />
<br />