Laserfiche WebLink
I'H.~ CITY OF <br /> <br />2001 <br /> <br />Hacienda Business Park Property Owners and ManMers: <br /> <br />After almost twenty years, Hacienda Business Park will soon have projects constructed on all of its lots. <br />While this "compledon" of Hacienda is neerin~, however, interest in expanding development within <br />Hacienda has increased. The Chy of Piston and thc Hacieada Owners Asso~iation'would like to be <br />sure that you m fiflly informed aborn the Park's development provisions and the impact these may have <br />on your property. <br /> <br />Whan it was first conceived, Hacianda's developen and the City of Pleesanton created a ma~er <br />development program for the Park through the City'S Planned Unit Development process: Development <br />~reements; a development plan with express conditions of approval; covenants, conditions, and <br />restrictions; and design guidelines were approved to govern each lot's development and that of'the Park <br />as a whole. These interrelating documents charted the course for park improvements, described <br />Hacienda's cl~racter, dictated the type and scope of development that may occur by lot, and also <br />determined the park's ultimate size. This last characteristic was defined by a development cap. <br /> <br />The development cap was never equivalent to the sum of the maximum potential development allowed <br />on each individual lot. The Design Guidelines were intended to allow some tots to develop more <br />intensively than others, with broad ranges. The development cap, however, fixed the total allowable <br />development for Hacienda overall. This methodology permitted flexibility of project sponsors to meet <br />the needs of the marketplace while maintaining a total project size consistent with environmental <br />constraints, most notably u'affic constraints. Thus, while any lot could be developed up to its maximum <br />allowed density,, other lots would have to be developed below their maximum allowable density in order <br />to stay within the total development cap. The City and Hacienda's principal developers have taken care <br />over ~imc to c;~urc that rca~on---bl¢ dcvclopm--nl op;ions would rc,"r,--.ia f~r each lot iix the Park. With <br />built and planned projects, the Park will be close to the total development cap. <br /> <br />Hacienda's development cap has changed several times during the Park's history. It now has two <br />sections: lots owned by Prudential and undeveloped in 1994 were capped at 4,631,059 square feet; lots <br />which had been built by then or sold were left with the balance oftha 9.889 miltion-squ~tre-foot cap. <br /> <br />The post-1994 Prudential lots have been either built or planned to fully utilize the 4,631,059-square-foot <br />mb-cap. These lots are not permitted to seek any of the rest of the development cap. <br /> <br />P. O. Bm S20, PleasantQn~, ~ 94566-0802 <br /> <br />(925) 48~.e025 (925) 484-0015 <br />Fax: 484-8385 Fax: ,184-0256 <br /> <br />Ut#fly Billins <br />(925) 484-80:38 <br />Fax: 484-8291 <br /> <br />200 Old Bernai Avenue <br /> <br /> (925) ~37 <br /> Fax: 484.8291 <br /> <br /> <br />