Laserfiche WebLink
Materials Credit 4: Recycled ConteM <br />Duc m th~ building ,~* _~id~ ~l~ll for ~ l,~~°mi ~ it ~ not ~bl~ ~ ~ ~e m ~e <br /> <br />Materials CrKlit 6: Rapidly R~newable Martials <br />even I~i~e~ O.f ~. ~mfliz~ ' minimum ammlm of mamiais that are ha~ested or pinnted. 'l'negefo~ <br /> mourn we wm sperry as much of the~e materials as possible to be rapidly renewable, tho total dollar <br />amonat will not ~/ml 5% of th~ building tmamaL <br /> <br />Materials Credit 7: Cmified Wood <br />Tbe hlildi~ is being designed as a specuiafi~ office buiMi~ and as such will not be furnished or tin,abed <br />~mu~mi wi~ mini smd~ Tlm~fo~ mo~ oftbe m~d ,im;~.~ for th~ c~ of this projm will <br />be for the formwofla It will be specified th~ i mhimam of $0% of this wood be ceflified in accordance <br />with tho Forest Stewardship Cmmcil Guidelines. Much of the formwork used in ~ building will have <br />been recycled and much of it will be recycled after conslructlon. <br /> <br />Indoor Environmental Quality (I£Q) <br /> <br />IEQ Prerequisite 1: Minimum IAQ Performance <br />Tbe I-WAC sys~n will be deai~ned to ~1 tbe minimum requirements of voluntary consensus stsndard <br />ASHRAG 62.1999, Ventilation for Acc~ Ah'Quality and approved Addenda since California Title 24 <br />~.mluira~onts are mom su'in~mU. <br /> <br />IEQ l~a'quisite 2: Envkonmenml Tobacco Smoke (ETS) Control <br />~ b~iiding will be · non-smoking faaility and a smoking patin/a~a is provided outside away from the <br />mm tory dorm md th~ reaular ped~rian path of ravel. <br /> <br />IEQ Credit h Carbon Dioxide (CO2) Monitoring <br />Tbe .c_ ~.uf~s~. ~ ~ .beiMimz ~ requ?e cbeng, in air that would P~'qude the n~-d for <br />momtormg ~.aroon uloxme since the befldin~ Mil not rely on operable windoWS for these requ~'ed air <br />cbenge~. <br /> <br />IEQ Credit 2: Increase, V~lihUion Eff~tive~ss <br />Callfo~a TMe ~4 EnerB3rcothm reguh~ the amount of outdoor air intxoduced into the HVAC system. <br />The air ehaage effecti~me~ will be designed (by plM'ement of the air terminals) to be ~rea(er than or eqUal <br />lo .9 as determined by ASHRAE 129-1997. <br /> <br />IEQ C4~dit 3: Construction IEQ Management Plan <br />Both c~as.m~ine ~ plan iuns will be COmplied with during and after c°flSwuction.' <br /> <br />IEQ Cl~lit 4: Low-Emitting Matmals <br />Adbeaiv~, paints mid coatings ~11 ~ ~ifi~ to m~ ~ Us~ ~lations along wi~ ~e S~ of <br />~i~'s ImM ~ ~afi~s. No ~ or ~or ~h~ ~ being selKtcd at ~is time al~ough <br /> <br /> <br />