Laserfiche WebLink
PART B <br /> <br /> AN ESTIMATE OF TH~ COST OF MAINTENANCE <br /> 2001-2002 <br />LIGHTING AND LANDSCAPE MAINTENANCE DISTRICT <br />NO. 1984-I, PONDEROSA HOMES <br /> CITY Q.F PLEASANTON <br /> <br />A. Landscaping (maintenauce): <br /> 1. Paseo Santa Cruz .......................................................................... $ 2.448.00 <br /> <br />B. Wa~r <br /> <br />1. All Planting ................................................................................... $ 1,880.00 <br /> 316.00 <br /> <br />C. Power <br /> 1.1 Controller ................................................................................... $ <br /> <br />D. Reserve/Long-Term Replacement Fund for scheduled long-term <br /> replaoement of various district improvements (see note) ............................. $ 548.28 <br /> <br />E. City of Pleasanton Administration Fee ................................................................. $ 625.00 <br /> SUBTOTAL $ 5,717.28 <br /> County Fees for Collection of Assessment (1.7%) ....................................... $ 96.04 <br /> GRAND TOTAL .......................................................................................... $ 5,813.32 <br /> Assessment per Unit (344 units) ....................................................... $16.90 per year <br /> <br />Note: <br /> <br />An existing surplus of approximately $7,700.00 exists for Landscape District 1984-1. These funds are held in <br />the inl~rest bearing account until needed for repairs to the soundwalls, irrigation system, landscaping or other <br />district feampes. <br /> <br />C:~ata\Coun~il 2001~eOND~R01.dO~ 4 <br /> <br /> <br />