Laserfiche WebLink
PART B <br /> <br /> AN ESTIMATE OF THE COST OF THE MAINTENANCE <br /> 2001-2002 <br /> BONDE RANCH LIGHTINO AND LANDSCAPE MAINTENANCE DISTRICT <br /> 1993-2, SHAPELL HOMES <br /> CITY OF PLEASANTON <br /> <br />A. Intensely Landscaped Areas (m~inter~nce): I. Independence Drive (107,400 sq. ft.) <br /> 2. Livingston Wsy (20,500 sq. ft.) <br /> <br /> total ares 127,900 sq. ft .................................................... $ 9.480.00 <br />B. Wster ................................................................................................... $ 2,400.00 <br /> <br />C. Power <br /> 1. Five Irrigation Comrollers ........................................... $ 1,050.00 <br /> <br />D. Fuel Transition Zone (Firebrcek) 287,000 sq. ft. <br />1. Weed Abatement .......................................................... $ 5,$00.00 <br /> <br />E. Street Lights <br /> 1. R¢-l~raping ...................................................................... $ 300.00 <br /> <br />F. Reserve/Long-Term Replacement Fund for scheduled long-term <br /> replacement of various dislzict impiovements (see note) ............ $ 4,690.00 <br /> <br />G. City ofPlcesanton Adminismstion ..................................................... $ 2.600.00 <br /> SUBTOTAL $26,050.00 <br /> County Fees for Collgction of Assessments (1.7%) ........................ $ 439.00 <br /> GRAND TOTAL ......................................................................... $26,489.00 <br /> Assessmen~ per Unit (103 units) ............................. $257.22 per year <br />Ngte: <br /> <br />Aa existing surplus of approximately $42,000.00 exists for Lighting and Landscape <br />M~ir~rumce Disu'ict 1993-2. These funds are held in an interest bearing accoum until <br />needed for repairs to the landscaping, irrigation systems, fencing or other district features. <br /> <br />C:~lsm~Cmmei12001~BONDE01.doc 4 <br /> <br /> <br />