Laserfiche WebLink
PART B <br /> <br /> AN ESTIMATE OF THE COST OF THE MAINTENANCE <br /> 2001-2002 <br />BONDE RANCH LIGHTING AND LANDSCAPE MAINTENANCE DISTRICT <br />1993-2, SHAPELL HOMES <br /> CITY OF PLEASANTON <br /> <br />A. Intensely Landscaped Areas (maintenance): 1. Independence Drive (107,400 sq. ft.) <br /> 2. Livingston Way (20,500 sq. ft.) <br /> <br />total area 127,900 sq. ft .................................................... $ 9,480.00 <br /> <br />B. Water ................................................................................................... $ 2,400.00 <br /> <br />C. Power <br /> <br />1. Five Irrigation Controllers ........................................... $ 1,080.00 <br /> <br />D. Fuel Transition Zone (Firebreak) 287,000 sq. ft. <br />1. Weed Abatement .......................................................... $ 5.500.00 <br /> <br />E. Street Lights <br /> 1. Re-larnping ...................................................................... $ 300.00 <br /> <br />F. Reserve/Long-Term Replacement Fund for scheduled long-term <br /> replacement of various district improvements (see note) ............ $ 4,690.00 <br /> <br />G. City of Pleasanton Administration ..................................................... $ 2.600.00 <br /> <br />Note: <br /> <br />SUBTOTAL <br /> <br />$26,050.00 <br /> <br />County Fees for Collection of Assessments (1.7%) ........................ $ 439.00 <br /> <br />GRAND TOTAL ......................................................................... $26,489.00 <br /> <br />Assessment per Unit (103 units) ............................. $257.22 per year <br /> <br />An existing surplus of approximately $42,000.00 exists for Lighting and Landscape <br />Maintenance District 1993-2. These funds are held in an interest bearing account until <br />needed for repairs to the landscaping, irrigation systems, fencing or other district features. <br /> <br />C:\data\Coun¢il 200BBONDE01 .doc 4 <br /> <br /> <br />