Laserfiche WebLink
<br /> CAPITAL IMPROVEMENT PROGRAM <br /> STREETS PROJECTS <br /> Recommended <br /> AmendmeDts Adjusted <br />CIP' Qtr2 Budget <br />995055 Neighborhood Traffic Calming Devices 0 0 <br />"'066 Dubin Canyon Road Bridge Replacement 0 277,494 <br />995067 Bernal Avenue at Arroyo Del Valle (Construct Second Bridge) 0 0 <br />995084 Study - 1580/Foothill Interchange 0 54,000 <br />997023 Hopyard Landscaping (also see Parks CIP) 0 21,277 <br />999999 Interchanges Landscape Maintenance (NPID3) 0 911,670 <br />895021 Bernal Bridge Pain1ing 0 434,562 <br />935028 Arroyo de la Laguna Bike Path: Arroyo Del ValleIPleasanton Canal 0 29,104 <br />935030 Extension of Livingston Way 0 12,000 <br />935045 Removal of Old Bernal Bridge Foundations 76,960 191,231 <br /> 2000-01 ExpenditUre!: <br />999999 To General Fund: 2107.5 Gas Tax 0 7,500 <br />999999 To General Fund: Congestion Mgmt Agency Funding 1,432 19,432 <br />999999 To General Fund for TEA 21 Engineering 0 200,000 <br />005003 Annual Resurfacing of Various City Streels 0 1,200,000 <br />00'004 Annual Slurry Sealing of Various City Streets 0 85,000 <br />005005 Bike Path Construction on Zone 7 G-I-I: Alamo Canal to Val Vista Park 0 67,100 <br />00'006 Stoneridge Drive Widening at Stoneridge Mall Road 0 153,700 <br />005007 Annual Traffic Buttons and Line Markers Installation 0 25,000 <br />005008 Dublin Canyon Road (Eastbound) Widening a1 Foothill Road 0 90,000 <br />00'009 Curb and Gutter Replacements for Street Resurfacing Projects 0 80,000 <br />005011 Foothill Road Widening a1 Dublin Canyon Road 0 998,000 <br />005014 1-580 Corridor Management/Signals, Phase II 0 525,000 <br />005015 Second Street Reconstruction from Kottinger to Neal Street 0 696,000 <br />005016 Alamo Cana1/Bikewayffrail Construction 0 500,000 <br />005017 1-580 Corridor Management/Signals, Phase I 0 3,289,941 <br />005018 1-580/680 Transit Enhancements 0 500,000 <br />005021 Evaluation & Reclassification of Street Surfaces (PMS) 0 55,000 <br />005024 Hopyard Road and Owens Drive Widening Phase II 0 121,740 <br />005027 New Sidewalks and Handicap Ramps 0 80,000 <br />005029 Bernal Avenue Widening from Vineyard to Arroyo Del Valle 0 831,500 <br />005030 Del Valle Parkway: Extension from First Street to California Ave 0 223,960 <br />005031 Santa Rita Road and Stoneridge Drive Widening 0 300,000 <br />005032 Santa Rita Road & Valley A venue Improvements 0 923,310 <br />005033 West Las Positas Resurfacing: Tassajara Creek! Santa Rita 0 873,000 <br />005033 West Las Positas Resurfacing: Tassajara Creek! Hacienda 231,500 231,500 <br />005035 Signal a1 First St and Kottinger 0 160,000 <br />005044 TYTD Reserve for Future Projects (450,000) 0 <br />005055 Neighborhood Traffic Calming Devices 0 105,944 <br />005068 Reserve for Bernal Interchange 378,000 378,000 <br />005067 LED Traffic Signal Rebate Program 229,147 229,147 <br />805008 Signal- Main@Vervais-ReimburseDeveloper 185,000 185,000 <br />995067 Bernal Avenue at Arroyo Del Valle (Construct Second Bridge) (332,636) 1,074,776 <br /> STREET PROJECT TOTAL S809,746 S26, 196,795 <br /> ENDING STREET FUND BALANCE SI,479,755 SI,679,698 <br />Streets FYOI Q2.xls 4/10/01 <br />- --~ .-.-.......-..--.--- -- .--. <br />