Laserfiche WebLink
NOW~ <br /> <br />DATED: <br /> <br />ATTEST~ <br /> <br /> CITY OF PLEASANTON <br /> COUNTY OF AL~JeSDA <br /> S~ATE 0F CALIFO~IA <br /> <br /> P~SOLUTION NO. 72- ~ <br /> <br /> RE: REVIEW OF BIDS AND AWARD OF CONTRACT <br /> IN CONNECTION WITH PROJECT 72'5 (STONE- <br /> RIDGE DRIVE WATER LIME). <br /> <br /> bids have been solicited and received for the <br /> construction of the Stoneridge Drive water line; <br /> and <br /> the bid submitted by Silva's Pipeline in the amount <br /> of $67,514.00 is the low bid; and <br /> the bid haS'been examined for clerical errors and <br /> none has been found and the bidder checked for <br /> <br /> reliability and performance and found satisfactory, <br />THEMPORE, BE IT RESOLVED AS FOLLOWS: <br /> <br />1. That the bid of SilvalsPipeline in the amount of <br /> $67,514.00 for the construction of Preject 72-5 <br /> (Stoneridge Drive Water Line) is approved and the <br /> contract in that amount aWardedto Silva~s Pipeline <br /> <br />for said work.1 ~o/~~ <br />October-9,1972 <br /> <br /> ~O RT tl~,'~MAYOR' <br /> <br />Date-k;)II~h ") _ . <br /> <br /> <br />