My WebLink
|
Help
|
About
|
Sign Out
RES 74074
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1970-1979
>
1974
>
RES 74074
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2001 7:55:35 PM
Creation date
1/5/2001 12:14:51 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
4/22/1974
DOCUMENT NO
RES 74074
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B.. STONERIDGE DRIVE <br /> <br />Preparation of assessment roll, assessment diagram, <br />engineer's report and the coordination of other related <br />functions which may be required under the provisions of <br />the said Municipal Improvement Act of 1913 but exclud- <br />ing subsequent work on bond segregation and/or sub- <br />division and parcel maps (designs, surveys, original <br />drawings, maps, blueprintS, plans and specifications <br />will be provided by others). <br /> <br />C. STONERIDGE DRIVE ~ND JOHNSON. INDUSTRIAL DRIVE <br /> <br />Rendition of general consultation and advice to First <br />Party, its officers, agents, or employees with respect <br />to the planning, preparation and handling of all engi- <br />neering phases of the aforesaid proceedings; <br /> <br />Attendance at such conferences and public meetings with <br />First Party as may be reasonably necessary to perform · <br />this contract of employment. <br /> <br />3. Second Party shall receive compensation for the above services <br /> <br />as follows: <br /> <br />A. JOHNSON INDUSTRIAL DRIVE <br /> <br />9.0% of the construction cost (including contingencies) <br />for completion of the plans and specifications, payable <br />upon receipt of the proceeds of assessments collected <br />and/or bonds sold, but the amount subject to adjustment <br />until completion of construction; <br /> <br />3.0% of <br />and job <br />tion (not including inspection); <br /> <br />B. STONERIDGE DRIVE ~ND JOHNSON INDUSTRIAL DRIVE <br /> <br />the construction cost for construction staking <br />coordination, payable upon completion of construc <br /> <br />1.5% of the construction cost for the assessment pro- <br />ceedings required of the Second Party, payable upon <br />receipt of the proceeds of assessments collected and/or <br />bonds sold. <br /> <br />The above amounts shall be paid by First Party out of the proceeds <br /> <br />Of assessments levied and bonds to be issued in said proceedings. <br /> <br /> 4. In the event said proceedings are not carried through to <br /> <br />conclusion, or shall be abandoned, then Second Party shall receive nothing. <br /> <br /> 5. In consideration of Second Party's fee for services, First <br />Party agrees that the Second Party will perform no on-site construction <br />review for this project; that such services will be provided by others'. <br /> <br />[C:\TEMP\~LF20001.BMP] <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.