My WebLink
|
Help
|
About
|
Sign Out
RES 00114A
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2000
>
RES 00114A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2008 11:33:51 AM
Creation date
9/11/2000 11:07:25 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
8/21/2000
DOCUMENT NO
RES 00114A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mitigation Monitoring and Reporting Program 1. Transportation <br />Page 73 <br />AIR QUALITY <br />Mitigation Measure: Kl. Prepare and implement a dust rnn[rol plan for the construction <br />period, which would control dust during all phases of constroo- <br />lion, to be reviewed and approved by the City Public Works <br />Department prior to development activity on the site. <br />Impact to be Mitigated: Construction activities would generate dust and PM-10 during both mass <br />grading and site-specific grading activities, creating the potential for nui- <br />sance. <br />Agency/Individual <br />Responsible for <br />Implementation: Site developer and project developers <br />Implementation Timing: (1) Prepare plan prior to commencement of mass site grading; update, <br />as necessary, for individual construction projects <br />(2) Implement plan during al] phases of construction <br />Mitigation Specifications: PUD Condition 77 requires adherence to dust control Bes[ Management <br /> Practices (BMPs) to control construction-related dust emissions during all <br /> phases of construction. These BMPs must be approved by the City <br /> Engineer and followed a[ all times during grading and consfruction <br /> operations.. <br />AgencyQodividual <br />Responsible for <br />Monitoring: City of Pleasanton, Public Works Dcpartmcnt and Building Department <br />Ac[iom by Monitor: (1) Review and approve plan. <br /> (2) Verify that all constmc[ion contractors are notified of the plan and <br /> its provisions, and that they respond to that notification. <br /> (3) Conduct compliance investigations during construction. <br />Monitoring Timing: (l) Prior [o issuance of first grading perm[ <br /> (2) Prior to issuance of all grading and construction permits <br /> (3) Ongoing during consvuction <br />NOTE: IMPLEMENTATIONOFTHlS MEASURE CONSISTENT WITH THE AUGUST, 2000 <br />SPECIF/C PLAN WILL NOT MITIGATE THLS IMPACT TO A LESS-THAN- <br />SIGNIFICANTLEVEL lNALL LOCATIONS. <br />Monitor: Completion Date: Signature: <br />
The URL can be used to link to this page
Your browser does not support the video tag.