My WebLink
|
Help
|
About
|
Sign Out
RES 00114A
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2000
>
RES 00114A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2008 11:33:51 AM
Creation date
9/11/2000 11:07:25 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
8/21/2000
DOCUMENT NO
RES 00114A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mitigation Monitoring and Reporting Program L Transportation <br />Page 71 <br />TRANSPORTATION <br />Mitigation Measure: J9b. Require the projeM sponsor to develop and implement aTrans- ', <br />potNation System Management Plan (TSMP) and require busi- ~', <br />messes to participate in Pleasantoda citywide TSMP. '.. <br />impact to be Mitigated: Project traffic would contribute [o cumulative tmffic growth on the road <br />network and freeway ramps in the vicinity of the project site. <br />AgencyQndividual <br />Responsible for <br />Implementation: Owners of nonresidential buildings <br />Implementation Timing: When leases are signed <br />Mitigation Specifications: PUD Condition 50(a) and (b) involve TSM programs for the <br />Commercial/Office development. <br />AgeocyHndividual <br />Responsible for <br />Monitoring: <br />Action by Monitor. <br />Monitoring Timing: <br />As a condition of each nonresidential lease, building occupants shall be <br />required to participate in Pleasanton's Transportation System Manage- <br />ment (TM) program. Participation in the program requires each occupant <br />to identify and implement strategies that will reduce PM peak hour [rip <br />generation mtes. Such strategies may include, for example, providing <br />incentives for carpooling, vanpooling, bicycling, or riding transit to and <br />from work, and providing for Oexible work hours (including allowing <br />employees work 80 hours over eight- or nine-day period spanning two <br />weeks instead of the typical ]0-day arrangement). <br />Participants in the program agree to survey their employees periodically <br />to determine the effectiveness of the TSM measures. <br />City of Pleasanton, TSM Coordinator <br />(I) Review and approve TSMP. <br />(2) Review and approve periodic reports <br />(1) A[ first ccrtificatc of occupancy. <br />(2) When reports are submitted. <br />monitor: Completion Hate: Signature: <br />
The URL can be used to link to this page
Your browser does not support the video tag.