Laserfiche WebLink
Mitigation Monitoring and Reporting Program 7. Transportation <br />Page 64 <br />TRANSPORTATION <br />Mitigation Measure: J'lc(2). Design traffic circles to have appropriate dimeusious and tref- <br />fic control signage for bicycle safety. <br />Impact to be Mifigated: Street desigm that includes roundabouts and traffic circles would create the <br /> potential for bike and pedestrian conflicts with motor vehicles. <br />AgeucyHndividual <br />Responsible for <br />Implementation: Site developer <br />Implementation Timing: (1) Incorporate appropriate design for traffic circles in the preliminary <br /> and/or final development plans. <br /> (2) Construct traffic circles as shown in final development plans. <br />Mitigation Specifications: For traffic circles accommodating bike and/or pedestrian paths, those <br /> facilities shall 6e designed to meet City standazds. <br />Agencyllndividual <br />Responsible for <br />Monitoring: CiTy of Pleasanton, Public Works Department <br />Action by Monitor: (1) Verify that final development plans incorporate the appropriate <br />design for haffc circles . <br />(2) Verify that trafio circles are built as designed. <br />Monitoring Timing: (I) Prior [o approval of the final development plan and prior to issuance <br />of grading permits for circulation elements. <br />(2) Prior [o City acceptance of street improvements. <br />Monitor: COmpletiOn Ddte: Signature: <br />