Laserfiche WebLink
Mitigation Monitoring and Reporting Program J. Transponaticn <br />Page 54 <br />TRANSPORTATION <br />Mitigation Measure: JSa. Coordinate the traffic signal iostallationa along Bernal Avenue <br />with tairgrounda personnel. Provide traffic signal interconnect <br />betweeo all signals on Bernal Avenue to mfnimfze delay to <br />through traffic on Beroal Avenue. <br />Impact to be Mitigated: Signalized access [o/from Bemal Avenue could conflict with fairgrounds <br />access and through traffic on Bemal Avenue. The August, 2000 Specific <br />Plan would greatly reduce this impact in view of the fact that the only new <br />signal on Bemal required would be at the West Parcel access road. <br />Therefore, conflict with fairgrounds traffic movements would no[ occur, <br />therefore coordination of signal installation with fairgrounds personnel is <br />not required. <br />An interconnect between the new signal and other Bernal Avenue signals <br /> would continue to be required. <br />Agency/Individual City of Pleasanton, Public Works Department (signal timing and intercon- <br />Responeible for nett) <br />Implementation: Project developer (funding) <br />Implementafion Timing: When new traffic signal on Bemal Avenue at Wes[ Parcel access road is <br /> installed. <br />Mitigation Specifcafions: Signal and interconnect to be provided as per City of Pleasanton <br /> specifications. <br />AgencyQndividual <br />Responsible fnr <br />Monitoring: City of Pleasanton, Public Works Department <br />Actian by Monitor: Verify that traffic signal and interconnect have been installed as specified <br />Monitoring Timing: Upon installation of new signal on Bemal Avenue. <br />Monitor: Completion Date: Signature: <br />