Laserfiche WebLink
Mitigation Monitoring and Reporting Program 1. Transportation <br />Page 52 <br />TRANSPORTATION <br />Mitigation Measure: Job. Desiga residential development an the Central Parcel so that it <br />does not have direct driveway access onto streets that Lave iraf- <br />6c volume greater than 3,000 vehicles per day. <br />Impact to be Mitigated: Traffic levels would exceed residential street capacity on neighborhood <br /> streets in the Central Parcel. <br />Agency/Individual <br />Responaible Cor <br />Implementatioo: Site developer and project developer(s) <br />Implementation Timing: During design of neighborhoods/subdivisions in [he Central Parcel <br />Mitigation Specifications: Orient residences so that driveway access is provided from local streets <br /> and avoided on streets with traffic volume greater than 3,000 vehicles per <br /> day. <br /> The PUD Plan conforms to this requirement. <br />Agency/Individual <br />Responsible for <br />Monitoring: City of Plcasantoq Planning Department <br />Action by Monitor: Verify that subdivision maps or other development plans (e.g., Planned <br />Unit Developments) conform [o the specitcations of [his measure. <br />Monitoring Timing: Prior to approval of tentative maps or other development plans <br />Monitor: Completion Date: Signature: <br />