My WebLink
|
Help
|
About
|
Sign Out
RES 00114A
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2000
>
RES 00114A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2008 11:33:51 AM
Creation date
9/11/2000 11:07:25 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
8/21/2000
DOCUMENT NO
RES 00114A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mitigation Monitoring and Reporting Program <br />]. Trnnsportation <br />Page 48 <br />Midgatioa Specifications Bemal Avenue modifications: Bernal Avenue would have asix-lane <br />(cont'd): cross-section. <br />Freewav modifications: The modified interchange provides only one gore <br />point for southbound traffic exiting [he freeway. This proposal requires <br />reconstruction of the overcrossing at Bernal Avenue and possible <br />widening of the I-680 bridge over [he Arroyo de la Laguna (north of the <br />interchange) to accommodate the loop onramp and the two-lane offramp. <br />Even with modifications, the loop onramp would not meet Caltrans <br />standards for new construction. <br />Pedestrian facilities: Pedestrians could walk safely on either side of <br />Bemal Avenue. Pedestrian facilities on [he south side of [he sheet aze <br />preferted, however. <br />Mitigation Responsibilities: <br />Site Develouer <br />(I) Include requirement for interchange improvement funding in the <br />Development Agreement. <br />(2) Provide funding for intersection improvements pursuant to <br />Development Agreement. <br />City of Pleasamon: <br />(3) Conduct monitoring studies at offramp until traffic volume reaches <br />1,440 vehioles per hour. <br />(4) Review monitoring reports and determine when traffic has reached <br />the level [hat requires improvements. <br />(5) Prepare improvement plans. <br />(6) Complete additional CEQA review. <br />(7) Obtain design approval and Encroachment Permit from Caltrans. <br />(8) Collect project funding from site developer pursuant to <br />Development Agreement. <br />(9) Cons[me[ improvements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.