Laserfiche WebLink
Mitigation Monitoring and Reporting Program D. Infrastructure Systems: Wastewater <br />Page 26 <br />INFRASTRUCTURE SYSTEMS: WASTEWATER <br />Mitigation Measure: D2b. Phase development so that demand for wastewater treatment <br />capacity does not eaceed capacity available to the City of Pleas- <br />aoton. <br />Specifications ojthis measure also apply 1o Mitigation Measure D36. <br />Impact to be Mitigated: Cumulative increase in demand for wastewater treatment capacity (Meas- <br />ure D2b) and export capacity (Measure D36). <br />Agency/individual Site developer, project developer(s), City of Pleasanton, Planning <br />Responsible for Department <br />Implementation: <br />Implementation Timing: Ongoing during development of project components that will connect to <br />the wastewater system <br />Mitigation Specifications: The City of Pleasanton has determined [hat wastewater capaciTy is no[ <br />exceeded by this Project, in conjunction with other development in the <br />City during [he development period, and the City has guaranteed the <br />developer wastewater capaciTy pursuant to a Growth Management <br />Agreement. <br />AgencyHndividaal <br />Responsible for <br />Monitoring: City of Pleasantou, Building Department <br />Action by Monitor: Verify that the City of Pleazanton has sufficient rights [o capacity in the <br />DSRSD wastewater treatment plant to accommodate expected flaws <br />from [he project element proposed for development (Measure D2b); <br />and verify that the City of Pleasanton has sufficient rights to <br />capaciTy in [he LAV WMA export facility to accommodate expected <br />flows from the projcct element proposed for development (Measure <br />D36). <br />Monitoring Timing: Prior to approval of Growth Management Agreement <br />Monitor: Completion Date: Signature: <br />