My WebLink
|
Help
|
About
|
Sign Out
RES 00114A
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2000
>
RES 00114A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2008 11:33:51 AM
Creation date
9/11/2000 11:07:25 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
8/21/2000
DOCUMENT NO
RES 00114A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mitigation Monitoring and Reporting Program C. Infrastructure Systems: Water <br />Page 22 <br />INFRASTRUCTURE SYSTEMS: WATER <br />Mitigation Measure: C2e. Require construction of improvements to the Pleasanton water <br />system to meet City standards. <br />Impact to be Mitigated: Cumulative increaze in demand for water distribution capacity. <br />Agency/Individual <br />Responsible for <br />Implementation: (Phase I) Si[e and project developer(s) <br /> (Phase II) City of Pleasanton <br />Implementation Timing: During site development <br />Mitigation Specifications: When development of Phase I of the site occurs, require that site and <br /> project developer(s) install that portion of the water system improvements <br /> shown in the Specific Plan and the PUD Preliminary Grading and Utility <br /> Plan. <br />When development of Phase II of the site occurs, the City of Pleasanton <br />will install the remaining portions of [he water system in accordance with <br />Pleasanton's Water Master Plan as shown in DEIR Figure 15, or its <br />functional equivalent. <br />Ageocy/Individual <br />Responsible for <br />Monitoring: CiTy of Pleasan[oq Public Works Department <br />Action by Munttor: (1) Verify that facilities are designed [o conform to City standards. <br />(2) Verify that facilities are bnill consistent with the approved design. <br />Monitoring Timing: (p Prior to approval of construction plans <br />(2) Prior to aecaptance of facilities by the City <br />Monitor: Completion Hate: Signature: <br />
The URL can be used to link to this page
Your browser does not support the video tag.