Laserfiche WebLink
Mitigation Monitoring and Reporting Program d. Infrastmcmre Systems: Drainage <br />Page 13 <br />INFRASTRUCTURE SYSTEMS: DRAINAGE <br />Mitigation Measure: B2. (Optiooaq Investigate feasible measures to protect the site from <br />Hood flows ie excess of the FEMA 100-year storm event in a ~.. <br />manner consistent with feasible grading options and which does <br />sot place existing development on the west side of the Arroyo at '~, <br />risk of a FEMA 500-year flood. i <br />Flooding in excess of the FEMA 100-year flood is not considered a significant project impact, and miti- <br />gation of the impacts of those floods is optional. Because there are d~erenees of opinion on the ques- <br />tion of future flow volume under the 100-year storm event, and because these d~erenees include condi- <br />tions under which 100-yearJ[ows would create out-of-bank conditions, the project may choose to imple- <br />ment a mitigation option lha7 responds to Impact 82. <br />impact to be Mitigated: The site under its current condition has a potential for flooding when flood <br />flows exceed the PEMA 100-year flood event. <br />Agency/Individual <br />Responsible for <br />Implementation: Site developer of the West Parcel <br />Implementation Timing: Prior to grading of [he West Parcel <br />Mitigation Specifications: If development on the site proceeds before a regional flood control plan is <br />approved by Lone 7 and other responsible ¢gencies, then site developer <br />shall incorporate into any plan for development of its site provisions to <br />protect habitable buildings on the West Parcel against the (remote) <br />possibility of a 25,500 cfs flood flow (which is the flood flow estimate <br />most recently provided by Zone 7). <br />This strategy is reflected in the preliminary grading plan for the Project, <br />and is further set forth in the PUD Plan. City staff will review the final <br />grading plan for the West Parcel, and conform the grading plan with Zone <br />7 analysis <br />Ageocy/Individual <br />Responsible for <br />Monitoring: City of Pleasantoq Public Works Department <br />Action by Monitor: Review and approve plan to provide protection from the 25,500 cfs storm <br />event. <br />Monitoring Timing: Prior to approval of a grading plan Fnr the West Parcel <br />Monitor: Completion Date: Signature: <br />